Laserfiche WebLink
<br />ATTACHMENT "A" <br /> <br />ANNUAL ENVIRONMENTAL REMEDIATION CONTRACT <br />CONSULTANT RATE COMPARISON FORM <br /> <br />Consultant shall complete this form and include it along with the comprehensive fee schedule in the <br />sealed fee envelope. This comparison is based upon services required for the following sample <br />projects. This form will be used for fee comparison purposes only. <br /> <br />Environmental Remediation <br />An underground storage tank is discovered on an existing site. A Phase II Assessment is required <br />to analyze the site. In the assessment, it is determined that 3 4-inch monitoring wells will be <br />required to a depth of approximately 60 feet below ground surface. The depth to the groundwater <br />is expected to be approximately 50-feet below ground surface. The primary objective of the <br />investigation is to determine the extent of contamination in both soil and groundwater. Soil samples <br />will be collected from each boring at five-foot intervals for geological description. Selected samples <br />(a total of three soil samples) will be forwarded to a California certified laboratory for chemical <br />analysis. The samples are to be analyzed by the following EPA Methods: <br /> <br />EPA Method No. 8015 (modified) <br />EPA Method No. 6010B17000 CAM Metals, and <br />EPA Method No. 8260. <br /> <br />Based on the results of the Phase II Assessment and the monitoring wells, prepare a report for the <br />Regional Water Quality Control Board. The cost comparison should include all costs necessary to <br />satisfy the requirements stated in the RFP. Consultant may add more tasks and classifications to <br />better represent actual staff and tasks. <br /> <br />Utilitv PotholinQ <br />One mile of storm drain pipe is planned to be constructed in an arterial road. Provide all costs <br />necessary to provide 15 utility potholes. Include traffic control. Assume the City will provide survey. <br />DescriDtion of Consultant Services <br /> Unit Quantitv Unit Cost Total <br />Prepare Work Plan LS 1 $ 650 $ 6S0 <br />Prepare Health & Safety Plan LS -L $ 125 $ 125 <br />Mobilization & Demobilization LS -..!.- $ 330 $ 330 <br />Geophysical Survey LS -L $ 1,130 $ 1,130 <br />Installing Monitoring Wells EA 3 $ 2,550 $ 7,650 <br />Laboratory Analysis LS ~ $ ?RO $ RL.O <br />Waste Disposal (soil 55-gallon drum) EA 3 $ 110' $ 110 <br />Prepare Draft Report to RWQCB LS -L $ 1.500 $ I.SOO <br />Prepare Final Report to RWQCB LS -L $ 500 $ 500 <br />N/A $ N/A $ N/A <br /> Total $ 1?,R35 <br />Utilitv PotholinQ EA 15 $ 1,295 $ 19,425 <br /> <br />EXHIBIT A <br /> <br /> <br />Tlu.... <br />