Laserfiche WebLink
<br />3. .All ramps throughout the project shall not exceed 12% slope ifno <br />parking occurs on the ramp and 5% maximum slope if parking is <br />on the ramp. <br /> <br />1. Vertical pedestrian circulation from be10'.v grade and structured <br />parking shall incorporate elevators, escalators and stairs. <br /> <br />.L~. Vehicular site access points will be provided from Lawson Way, <br />Main Street and two points from O',vens Drive Memory Lane, as <br />defined on the site plan. <br /> <br />6. All underground parking shall have mechanical smoke <br />control/removal. <br /> <br />7. Parking operator shall prepare, submit, and comply '.vith a parking <br />control plan to the City for revie'.v, pursuant to which the operation <br />of the parking facilities and duties of the parking operator staff'.vill <br />be described. Plan shall also include event parking controls and <br />description or bollard controls. <br /> <br />2.&. There shall be no sharing of residential parking. <br /> <br />~9. Parking gate locations and stacking distances shall comply with <br />applicable Department of Public Works policies. <br /> <br />4.M. No partitions, walls or other obstructions shall be built or placed <br />with the attached single family, four car garage~ preventing the <br />spaces from being used by residents and guests for the parking of <br />vehicles. <br /> <br />5.U. Recreational vehicle, boats. trailers or similar storage is prohibited <br />on-site. <br /> <br />12. L^JI ramps throughout the project shall not exceed 12~<' slope ifno <br />parking occurs on the ramp and 5% maximum slope if parking is <br />on the ramp. <br /> <br />6.H. The townhouses shall be designed with vertical roll-up garage <br />doors. <br /> <br />7.+4. All paved areas shall be sloped to drain. Finished slope of areas <br />paved with asphalt concrete (AC) shall be not less than one <br />percent. Finished slope of areas paved with portland concrete <br />cement (PCC) shall not be less than one-half of one percent. <br />Portland Cement concrete gutters shall be installed to receive <br /> <br />19 <br />75A-180 <br />