My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2005-02-22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
02/22/2005
>
FULL PACKET_2005-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2015 10:25:28 AM
Creation date
2/16/2005 1:43:47 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City Place <br />Focused Environmental Impact Report <br /> <br />Findings and Facts in Support of Findings <br /> <br />be covered under the Storm Water Permit. Additionally, the project proponent shall prepare <br />a SWPPP which will require implementation of Best Management Practices (BMPs) , The <br />project proponent shall implement the SWPPP and will modify the SWPPP as directed by the <br />Storm Water Permit. These provisions shall be included in the plan notes, The SWPPP shall <br />include all of or a combination of specific BMPs as follows: <br /> <br />a) Sediment for areas disturbed by construction shall be retained on site using structural <br />controls such as sandbags, fencing or retention ponds, <br /> <br />b) Stockpiles of soil shall be properly contained to eliminate or reduce sediment transport <br />from the site to the streets, drainage facilities or adjacent properties via runoff, vehicle <br />tracking or wind, <br /> <br />c) Appropriate BMPs for construction-related materials, wastes, spills or residues shall be <br />implemented to minimize transport for the site to streets, drainage facilities or adjoining <br />properties. <br /> <br />d) Runoff from equipment and vehicle washing shall be contained at construction sites unless <br />treated to reduce or remove sediment and other pollutants. <br /> <br />e) All construction contractor and subcontractor personnel are to be made aware of the <br />required BMPs and good housekeeping measures for the project site and any associated <br />construction staging areas, <br /> <br />f) At the end of each day of construction activity, all construction debris and waste materials <br />shall be collected and properly disposed of in trash or recycle bins, <br /> <br />g) Any designated smoking area shall have an appropriate cigarette waste receptacle that is <br />fitted to not allow cigarette butts to enter storm water or drains during rain or high winds, <br />All contractor and subcontractor personnel will be directed to dispose of cigarette butts in <br />these receptacles. <br /> <br />For Post-Construction (Water Quality Management Plant (WQMP) <br /> <br />W-4 Prior to finalizing design plans, a WQMP shall be prepared addressing post construction <br />storm water runoff. This will consist primarily of structural BMPs addressing the urban <br />runoff from the site. As part of the final design plans for the parking lot, drainage for the <br />parking area shall be fitted with structural BMPs to reduce or eliminate urban runoff in the <br />form of catch basins with filters (most likely fossil) or other equivalent filtration device that <br />are regularly maintained and cleared so as to remain effective throughout the storm season, <br />Regular clearing of large debris after a storm to shall be incorporated into the ongoing <br />maintenance program for the City Place project site. <br /> <br />Level of Significance of Impacts Related to Water Quality <br /> <br />U: IDBottlwp51 ICity Place findings. doc <br />September 29, 2004 <br /> <br />Page 13 <br /> <br />75A-135 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.