My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2005-02-22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
02/22/2005
>
FULL PACKET_2005-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2015 10:25:28 AM
Creation date
2/16/2005 1:43:47 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6. The design of improvements of the proposed project will not conflict <br />with easements necessary for public access through or use of the <br />property within the proposed project. <br /> <br />There are no easements that would affect the use or <br />development of this site. Approval of Vesting Tentative Tract <br />Map No. 2004-06 will not create conflicts with the easements <br />necessary for public access through the property, as no such <br />easements currently exist. Public access will be allowed to <br />the site, as this development as an urban project concept <br />encourages pedestrian and public activity. <br /> <br />F. Applicant is seeking Conditional Use Permit No. 2004-28 to allow the live- <br />work component of the project. Santa Ana Municipal Code Section 41- <br />638 authorizes the Planning Commission to grant a conditional use permit <br />upon making certain findings. <br /> <br />1. Will the proposed use provide a service or facility, which will <br />contribute to the general welfare of the neighborhood or <br />community? <br /> <br />The proposed conditional use permit to allow the <br />construction of 73 live-work studios will provide a residential <br />living with opportunity to commercial businesses. The <br />unique provision of space that can be utilized for dual <br />purposes within a single unit provides a component integral <br />to the mixed-use nature of the City Place project and the <br />zoning goals. The injection of living and working space will <br />provide a lifestyle that has proven successful throughout <br />urban areas within the United States. A live-work project will <br />add to the vibrant dynamics of a mixed-use project, <br />increasing activity within the District Center designation of <br />the General Plan. <br /> <br />2. Will the proposed use under the circumstances of the particular <br />case be detrimental to the health, safety or general welfare of the <br />persons residing or working in the vicinity? <br /> <br />The approval of the conditional use permit will not be <br />detrimental to persons residing or working in the area <br />because the use, as conditioned, will not create negative or <br />adverse impacts. Environmental Impact Report 2004-01 has <br />been prepared for the proposed project, identifying potential <br />impacts, over-riding considerations and mitigation measures <br />aimed at reducing any environmental impact associated with <br />this project. The addition of persons within a large vacant <br />portion of north Main Street will assist in promoting the <br />economic viability and enhance the livability for this area. <br /> <br />Resolution No. 2005-017 <br />Page 40f 6 <br /> <br />75A-439 <br />
The URL can be used to link to this page
Your browser does not support the video tag.