Laserfiche WebLink
<br />--- <br /> <br />AGREEMENT 1-2354 <br />Exhibit A <br /> <br />~ <br />-~ <br /> <br />Task 19.00 <br /> <br />Special Studies <br /> <br />The scope for Task 19, in the CONSULTANT's Schedule of Values, is based on the Special <br />Studies that will be required on as needed basis during the PE phase of The CenterLine Project, <br />as requested by FTA, the three cities, and AUTHORITY Board members, or others. Work <br />authorization for these Special Studies will be granted through the issuance of Contract Task <br />Orders (CTO'S), Each CTO will specifically define the scope of services required, and the <br />associated price. ' <br /> <br />The following clarifications are an example of special tasks that will need to be completed during <br />the PE phase: <br /> <br />. <br /> <br />Perform LRTlMonorail technology study. <br />Consultant will provide a Senior Staff person to each participating city for at least three <br />months.' , <br />Review of alignment options for Costa Mesa. <br /> <br />. <br /> <br />. <br /> <br />Task 19.01 Cost and Operation Analysis ofLRT and Monorail Transit Systems S~ecial Study <br /> <br />CONSULTANT will apply their experience, systems engineering, and core technology expertise <br />in preparing a cost and operational analysis of LRT and monorail transit systems for the specific <br />conditions of the CenterLine Project. The work activities to be perfom1ed by the <br />CONSULTANT will be as follows: <br /> <br />. <br /> <br />Complete a preliminary cost estimate for Monorail system that would run on the 17.9- <br />mile LP A. <br /> <br />Complete a preliminary cost estimate for a LRT system that would be on elevated <br />structures for the entire 17 .9-mile LP A. ' <br />Complete a preliminary cost estimate for a LRT system that would nm at-grade along <br />the entire 17 .9-mile LP A. <br /> <br />Complete an operations and maintenance comparison, including the estimated life <br />cycle costs for the monorail system and the LRT system. ' <br /> <br />Submit a written report of the CONSULTANT's findings regarding this scope of <br />work to the AUTHORITY by July 12, 2002. <br /> <br />Be prepared to present the findings to The AUTHORITY's Transit Planning and <br />Operations Committee, and to the CenterLine Policy Working Group. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />60 <br /> <br /> <br />(}~ <br /> <br />