Laserfiche WebLink
<br />Stage 2 smog <br />episodes. <br /> <br />Streets <br />surrounding the <br />project site <br />should be cleaned <br />at the end of <br />each day of <br />construction. <br /> <br />All material <br />transported <br />offsite shall <br />either be <br />sufficiently <br />watered or <br />securely covered <br />to prevent <br />excessive amounts <br />of dust. <br /> <br />Equipment engines <br />shall be <br />maintained in <br />good condition <br />and in proper <br />tune according to <br />manufacturer's <br />specifications. <br /> <br />To the extent <br />feasible, <br />gasoline powered <br />equipment shall <br />be used for <br />onsite and <br />offsite <br />construction <br />activities. <br /> <br />The approved site <br />plan for the <br />project shall <br />show the location <br />of all monitoring <br />wells on the <br /> <br />Prior to <br />Building <br />Permits <br /> <br />Building/Planning <br />Agency <br /> <br />31A-120 <br />