|
<br />RESOLUTION 2005-052
<br />REVENUE FY 05-06
<br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES
<br />SECTION VI PUBLIC WORKS AGENCY
<br />5577 Tract Map - Final
<br /> Hourly Rate Per Hour 121.41
<br /> Flat fee minimum at $1,214.13 Minimum 1,214,13
<br />5577 Parcel Map - Final
<br /> Hourly Rate Per Hour 121AI
<br /> Flat fee minimum at $1,214,13 Minimum 1.21413
<br />5577 Lot Line Adjustment Per Hour 121.41
<br /> Minimum 364,23
<br />5577 Certificate of Compliance Per Hour 121.41
<br /> Minimum 364,23
<br />86-01-5921 Single Family Residence Repair Fee for:
<br /> driveways, sidewalks, curb coring Each 66,77
<br />86-01-5921 Street Work Pennits/Inspection Fees
<br /> Charged in addition to other fees Each 123,04
<br />86-01-5921 Inspection Fees:
<br /> Trench Excavation/Back Fill
<br /> (unless included in other fees)
<br /> In Dirt-$107,91 minimum Linear Foot 0,60
<br /> Minimum 107,91
<br /> In Paving-$107,91 minimum Linear Foot 0.85
<br /> Minimum 107,91
<br />86-01-5921 Stonn Drains/Culverts, Sewer, Water Mains/Line Channels
<br /> In Dirt-$107,91 minimum Linear Foot 3A5
<br /> Minimum 107,9]
<br /> In Paving-$107,91 minimum Linear Foot 3.94
<br /> Minimum 107,91
<br />86-01-5920 Sewer LateralslWater Services Each 240,10
<br />86-01-5921 Traffic Occupancy or Lane Closure Requiring Signage
<br /> All Streets Per Day 225,28
<br /> Minor Streets Deposit 712.25
<br /> Major Streets Deposit 948.31
<br />86-01-5921 Manhole, Vaults, Catch Basins and required signage.
<br /> striping or barricades
<br /> Plus Earthwork Each 180,76
<br />86-01-5921 Curb, Gutter or Combination including Earthwork
<br /> $107,91 minimum Linear Foot 1.46
<br /> Minimum 107,91
<br />86-01-5921 Curb Return, including Earthwork
<br /> $107,91 minimum Each 58,01
<br /> Minimum ]07,91
<br />86-01-5921 Sidewalk including Earthwork
<br /> $107,91 minimum Sq,Foot 0,52
<br /> Minimum 107,91
<br />86-01-592] Drive Approach including Earthwork
<br /> $107,9] minimum Sq, Foot 0.67
<br /> Minimum 107,9]
<br />86-01-5921 Paving, including Earthwork
<br /> (0 - 2000 sq, ft,)-$107,91 minimum Sq, Foot 0,21
<br /> (Over 2000 sq, ft,)$107,91 minimum Sq, Foot 0,15
<br /> Minimum 107,91
<br />
<br />24
<br />
<br />75A2-31
<br />
|