My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - NEXUS DEVELOPMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
06/20/2005
>
75B - NEXUS DEVELOPMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:54:43 PM
Creation date
6/15/2005 2:26:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
6/20/2005
Destruction Year
2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />32. As required by the AELUP, prior to issuance of the certificate of use and <br />occupancy, the City shall ensure that the sales office for the residential <br />unit posts a conspicuous sign informing potential buyers to the presence <br />of the airport. The notice shall be in the same language as the need <br />notice. <br /> <br />33. Prior to the issuance of a building permit, the project developer shall <br />provide evidence to the Planning Manager that an FAA "NO Hazard" <br />determination has been secured for the operation of construction cranes. <br />The project developer shall demonstrate compliance with any conditions <br />imposed by the FAA. <br /> <br />34. During construction, the contractor shall be required to comply with <br />SCAQMD Fugitive Dust Rule 403 to suppress dust generated by <br />construction operations. To ensure compliance with SCAQMD Fugitive <br />Dust Rule 403, grading plans and demolition plans for the proposed <br />project shall reflect the following notes: <br /> <br />· All materials excavated or graded shall be sufficiently watered to <br />prevent excessive amounts of dust. Watering with complete <br />coverage shall occur at least twice daily, once in the late morning and <br />once after work is done for the day. <br /> <br />· All clearing and earthwork activities shall cease during periods of high <br />winds (winds greater than 25 mph averaged over one hour) or during <br />Stage 1 or Stage 2 smog episodes. <br /> <br />· Internal roadways and project site entry and exit points shall be <br />cleaned at the end of each day by the project developer. Dust and <br />debris from construction activities that migrates or is carried onto <br />MacArthur Boulevard or Main Street adjacent to the project site shall <br />also be cleaned each day. <br /> <br />· All material transported off-site shall either be sufficiently watered or <br />securely covered to prevent excessive amounts of dust. Haul trucks <br />leaving the site shall have a minimum freeboard distance of 12- <br />inches. <br /> <br />· Construction equipment leaving the project site shall be wheel <br />washed. <br /> <br />· The amount of area disturbed by clearing and earthwork activities <br />shall be minimized at all times. <br /> <br />· Equipment engines shall be maintained in good condition and in <br />proper tune according manufacturer's specifications. <br /> <br />Exhibit "A" <br />Page 5 of 15 <br /> <br />75B-183 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.