My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - NEXUS DEVELOPMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
06/20/2005
>
75B - NEXUS DEVELOPMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:54:43 PM
Creation date
6/15/2005 2:26:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
6/20/2005
Destruction Year
2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. Internal roadways and project site entry and exit points shall be <br />cleaned at the end of each day by the project developer. Dust and <br />debris from construction activities that migrates or is carried onto <br />MacArthur Boulevard or Main Street adjacent to the project site shall <br />also be cleaned each day. <br /> <br />. All material transported off-site shall either be sufficiently watered or <br />securely covered to prevent excessive amounts of dust. Haul trucks <br />leaving the site shall have a minimum freeboard distance of 12- <br />inches. <br /> <br />. Construction equipment leaving the project site shall be wheel <br />washed. <br /> <br />. The amount of area disturbed by clearing and earthwork activities <br />shall be minimized at all times. <br /> <br />. Equipment engines shall be maintained in good condition and in <br />proper tune according manufacturer's specifications. <br /> <br />. To the extent feasible, construction equipment shall use alternative <br />clean fuels such as compressed natural gas equipment with <br />oxidation catalysts. If alternative clean fuels are not feasible, <br />gasoline powered construction equipment shall be used. <br /> <br />. Construction equipment operating on diesel fuel shall use <br />particulate filters or low sulfur diesel. <br /> <br />. To the extent feasible construction operations shall use electricity <br />from power poles in-lieu of temporary diesel or gasoline-powered <br />generators. <br /> <br />30. Prior to commencement of construction activities, the project developer shall <br />identify to the City a construction relations officer to act as a community <br />liaison concerning on-site activity, including resolution of issues related to <br />dust generation from grading/paving activities. A publicly visible sign shall <br />be posted with the name of construction relations officer and a telephone <br />number. <br /> <br />31. During finish work, the construction contractor shall ensure the minimization <br />of ROG emissions. Building plans for the project shall specify and require <br />the use of pre-coated building materials, use of high pressure-low volume <br />(HPL V) paint applicators with 50 percent efficiency, and use of lower <br />volatility paint not to exceed 100 grams of ROG per liter. <br /> <br />Exhibit "C" <br /> <br />7~B5_~149 <br />
The URL can be used to link to this page
Your browser does not support the video tag.