My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GRAND PLAN I & II 1
Clerk
>
Contracts / Agreements
>
G
>
GRAND PLAN I & II 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:54:32 PM
Creation date
7/21/2005 1:31:31 PM
Metadata
Fields
Template:
Contracts
Company Name
Grand Plan I, LLC & Grand Plan II, LLC
Contract #
A-2005-190
Agency
Planning & Building
Council Approval Date
6/20/2005
Expiration Date
6/20/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT D <br />PUBLIC IMPROVEMENTS] <br /> <br />Improvement Location <br />Street Reconstruction Hutton Centre Drive between Sandpointe <br /> A venue and MacArthur Blvd. Sandpointe <br /> A venue between Main Street & Hutton Centre <br /> Drive Hutton Centre Loop Road between Hutton <br /> Centre Drive to the most easterly driveway on <br /> the north side Eastbound MacArthur Blvd. lanes <br /> between Main Street and Hutton Centre Drive <br />Construct eastbound right-turn lane MacArthur Blvd. east of Main Street <br />Provide second northbound right-turn lane Hutton Centre Drive between MacArthur Blvd. <br /> and Hutton Centre Loop Road <br />New traffic signal Hutton Centre Drive and Hutton Centre Loop <br /> Road <br />Raised median Hutton Centre Drive from MacArthur Blvd. to <br /> 280 feet south of Hutton Centre Loop Road <br />Raised median Hutton Centre Loop Road to most easterly <br /> driveway on north side <br />Colored crosswalk Hutton Centre Loop Road east of Hutton Centre <br /> Drive and sidewalk on north side to most <br /> westerly driveway <br />Street widening to provide fourth eastbound lane MacArthur Blvd. between Hutton Centre Drive <br /> and SR55 southbound on-ramp <br />Traffic signal modification to provide second MacArthur Blvd. at Hutton Centre Drive <br />northbound right-turn lane <br />Raised median Main Street between Sandpointe A venue and <br /> MacArthur Blvd. <br /> <br />Owner shall be obligated to pay prevailing wages in connection with the construction of the Public <br />Improvements in accordance with the requirements set forth in Attachment No.1, attached hereto and incorporated <br />herein by reference. <br /> <br />D-l <br /> <br />DOCSOC/1110339vl1/24579-0001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.