My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUNTER, CREIGHTON D. 1
Clerk
>
Contracts / Agreements
>
H
>
HUNTER, CREIGHTON D. 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:57:33 PM
Creation date
9/7/2005 11:59:54 AM
Metadata
Fields
Template:
Contracts
Company Name
Creighton D. Hunter
Contract #
N-2005-039
Agency
Public Works
Expiration Date
12/31/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br /> <br />t? )(11./:I,-f " A '1 <br />~A~.f. , <br /> <br />Scope of work <br /> <br />Leighton Consulting's proposed scope of work is summarized below. <br /> <br />Task 1 - Pre-Field Activities <br /> <br />Leighton Consulting will update the current site Health and Safety Plan and prepare a <br />Supplemental Site lnvestigation Workplan for submittal to the City of Santa Ana Fire <br />Department for their comment and approval. Leighton Consulting will mark-out the area of <br />investigation and will contact Underground Service Alert (USA) two days prior to conducting <br />field-work for their identification of utilities in the work area. Leighton Consulting will assist in <br />obtaining the necessary encroachment permit to conduct a hand auger boring in the City <br />sidewalk. <br /> <br />Task 2 - Hand Auqer Borinqs <br /> <br />Leighton Consulting proposes to advance two hand auger borings, HA-I and HA-2, in the <br />suspected locations of the 5,000-gallon tank (HA-I) and the second 7,500-gallon tank (HA-2) as <br />indicated on Figure 2. ]f present, the tank tops are anticipated to occur at a depth of 4 to 6 feet bgs. <br /> <br />Task 3 - Direct Push and Hollow-stem Auqer Borinqs <br /> <br />Leighton Consulting proposes to advance up to 6 borings, 13-] through 13-6, to depths of 40 to <br />115 feet bgs to further define the lateral and vertical e:-:tent of soil contamination. The proposed <br />boring locations are shown in Figure 2. Boring B-1 will be drilled to a sufticient depth to sample <br />groundwater or establish that 20 fcet of clean (non-impacted) soil is present above the first <br />occurrence of groundwater. Borings B-2 through 8-6 will be advanced to 40 feet bgs. The <br />objecti\'es of the borings arc discussed below: <br /> <br />Boril1g B-1 <br /> <br />Boring B-1 will be installed in the vicinity of the highest concentrations of gasoline impacted <br />soil detected at the site, adjacent to the sidewalk and southwest of the discovered 7,500-gal1on <br />UST. The boring will be advanced to a depth of up to ]] 5 feet bgs, utilizing a CME-95 UT <br />hollo\\-stem auger drill fig. Soil samples ,,'ill be collected at five-foot intervals for <br /> <br />" <br /> <br />.- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.