My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - 2800 N FARMERS DR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
11/07/2005
>
75C - 2800 N FARMERS DR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:50:43 PM
Creation date
11/2/2005 11:19:38 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75C
Date
11/7/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />a. Site Assessment. <br /> <br />b. Site Design BMPs. <br /> <br />c. Applicable Routine Source Control BMPs. <br /> <br />d. Selection and sizing of the Treatment Control BMPs. <br /> <br />e. Mechanisms by which funding for long-term operation and <br />maintenance of Structural BMPs will be provided. <br /> <br />f. Operation and Maintenance Plan to describe the long-term <br />operation and maintenance requirements of all applicable <br />Structural BMPs, and to identify the entity in charge of <br />implementation. <br /> <br />25. Prior to the issuance of grading permits, the project developer shall <br />submit a final run-off evaluation for review and approval showing <br />the existing and proposed facilities and methods of draining the site <br />without exceeding the capacity of any street or adjacent storm drain <br />facility. <br /> <br />26. Prior to issuance of grading permits, the project developer shall <br />submit to the City of Santa Ana Planning Division a letter from the <br />Department of Defense and CalTrans that adequate access is <br />provided to the Department of Defense fuel line and the CalTrans <br />sound wall. <br /> <br />27. Grading Plans and Building Plans for the proposed project shall <br />note that all construction equipment shall be properly maintained <br />and tuned to minimize noise emissions. <br /> <br />28. Grading Plans and Building Plans for the proposed project shall <br />note that all equipment shall be fitted with properly operating <br />mufflers and air intake silencers. <br /> <br />29. To ensure compliance with SCAQMD Fugitive Dust Rule 403, <br />grading plans for the proposed project shall reflect the following <br />notes: <br /> <br />a. All material excavated or graded will be sufficiently watered <br />to prevent excessive amounts of dust. Watering with <br />complete coverage shall occur at least twice daily, once in <br />the late morning and once after work is done for the day. <br /> <br />EXHIBIT "A" <br />Page 4 of 7 <br />75C-169 <br />
The URL can be used to link to this page
Your browser does not support the video tag.