Laserfiche WebLink
<br />, ; <br /> <br />'-' <br /> <br />'-" <br /> <br />Scope of Supply (Power Supply Upgrades) <br /> <br />Severn Trent, ClorTec proposes to replace the existing Astec and CND power supplies with <br />the following: <br /> <br />Fourteen <br />each <br /> <br />Expandable Bridge Rectifiers for T-series systems. <br /> <br />. The above listed service will be provided by a STS, ClorTec factory trained <br />Technician. STS is the only company authorized to perform the power supply <br />upgrade installation. Before the upgrade can be performed, the system must be in <br />operational condition. An authorized STS Technician will perform an evaluation prior to <br />starting any work. This quote also includes the following items: <br />. The documented system changes will be provided in AutoCAD 2000 or PDF, which <br />ever you prefer. <br />. The Power Supplies will be supported for a minimum period of three years. <br />. Upon completion of the upgrade, the entire system will be inspected and evaluated <br />in preparation for sign off. This will be accomplished by using the standard STS <br />validation procedure. Any additional repair work will be documented. <br />. An addendum pertaining to the upgrade work will be provided for insertion into your <br />o & M manual. <br /> <br />Price (Control Panel Upgrade) <br /> <br />Item Price Each Total Price <br />No. Qty. Description US$ US$ <br />1 Ten Each Expandable bridge rectifier to $5,000.00 $50,000.00 <br />upgrade existing CND power <br /> supplies. <br />2 Four Each Expandable bridge rectifier with $6,000.00 $24,000.00 <br />separate enclosure to upgrade <br /> existinQ Astec power sunnlies. <br />3 One Lot Programming Included Included <br />4 One Lot Installation Included Included <br />5 One Lot Startup & Training Included Included <br />6 One Lot California State Use Tax $5,920.00 $5,920.00 <br /> Total: $79,920.00 <br /> <br />Severn Trent Water Purification, Inc. <br /> <br />Page 2 of? <br />