My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-02-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
02/21/2006
>
FULL PACKET_2006-02-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:48:31 PM
Creation date
2/15/2006 12:10:02 PM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order No. 1 <br />Project No. 05-3197 <br />February 21, 2006 <br />Page 2 <br />On September 19, 2005, the City awarded a contract for the Main Street <br />Water Main Improvements Project to A. R. Sarmiento, Inc. for the <br />estimated amount of $341,220 plus a ten percent contingency totaling <br />$375,342. This project provides for construction of a new water main and <br />appurtenances along Main Street from MacArthur Boulevard to Sunflower <br />Avenue. <br />The following three items are responsible for the cost increases: <br />1. The limited access to the Hutton Center offices has prompted the <br />request to have the contractors work longer hours and Saturdays to <br />mitigate the impact to the offices and to complete the project as <br />soon as possible. <br />2. During construction, concrete pavement was encountered beneath the <br />existing asphalt street. The concrete, estimated to exist along the <br />entire length of the project, was not shown on the plan. <br />3. At several locations existing utilities were in conflict with the <br />new water main. To work around these utilities the contractor needs <br />to install the water main at a lower depth. <br />These unforeseen conditions will result in additional costs related to <br />overtime work, saw cutting, demolition, disposal, and installation of the <br />water main at a deeper level. The extra work will be done on a time and <br />materials basis. <br />Since this change order will exhaust the project contingency, the <br />Council's approval is required to cover this extra cost and preserve the <br />project's contingency for any additional project unforeseen conditions. <br />Estimated cost = $69,500 <br />FISCAL IMPACT <br />The cost for the change order is estimate at $69,500. Funds are available <br />in the Water Utility Capital Projects Fund (account no. 66-579-6635). <br />APPROVED AS TO FUNDS AND ACCOUNTS: <br />James G. oss ~F'rancisco Gutierrez <br />Executive Director ~ Executive Director <br />Public Works Agency Finance & Mgmt. Services Agency <br />,, <br />23A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.