My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-04-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
04/03/2006
>
FULL PACKET_2006-04-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:47:42 PM
Creation date
4/11/2006 3:58:52 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Civic Center Drive Sanitary <br />Sewer Improvements <br />April 3, 2006 <br />Page 2 <br />NAME OF BIDDER CITY <br />1. Dominguez General Engineering Rosemead <br />Contractor <br />2. Beador Construction Company, <br />Inc. <br />3. GCI Construction, Inc. <br />4. Prkacin Company <br />5. SRD Engineering, Inc. <br />6. Clarke Contracting Company <br />7. Ken Thompson, Inc. <br />BID AMOUNT <br />$ 775,625.00 <br />Corona $ 794,300.00 <br />Costa Mesa $ 819,467.50 <br />Glendale $ 825,472.00 <br />Anaheim $ 847,500.00 <br />Lawndale $1,312,815.00 <br />Corona $1,423,265.00 <br />A total of 8 bids were received and all but one were responsive. Ciedro <br />Construction failed to notarize their bidder's signature on the bid bond <br />as required by the bidding documents and therefore, Ciedro Construction's <br />bid is non-responsive. The lowest bid was submitted by Dominguez General <br />Engineering Contractor, for $775,625, which is above the Engineer's <br />estimate of $727,925. <br />LNVIROI3MEI3TAL IMPACT <br />In accordance with the California Environmental Quality Act, the <br />recommended action is exempt from further review. Categorical Exemption <br />ER no. 2006-18 has been filed. <br />FISCAL IMPACT <br />The funding analysis shows a total estimated construction cost of <br />$969,900 for the project (Exhibit 2). Funds are available in the <br />Sanitary Sewer Service Fund (account no. 55-532-6631). <br />APPROVED AS TO FUNDS AND ACCOUNTS: <br />James G. Ross /Francisco Gutierrez r <br />Executive Director ~A Executive Director ~1^ <br />Public Works Agency UUU Finance & Mgmt. Services Agency <br />K:\COnstruction\RFCA-draft\06-3511 60WD <br />23B-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.