Laserfiche WebLink
%WW .r0' <br />7. CITY OF SANTA ANA RESPONSIBILITIES <br />In addition to the City's responsibilities set forth elsewhere in this Agreement, Santa Ana shall <br />also have the following responsibilities: <br />a. City, through its law enforcement personnel, shall be solely responsible for <br />determining which Violations to cite and prosecute; <br />b. It shall be the exclusive responsibility of City to establish signal timing for all <br />phases (green, yellow, and red) of traffic signals at monitored intersections in conformance with <br />legal requirements; and <br />C. The City shall be solely responsible for the fabrication of any signage, notices or <br />other postings required pursuant to any law, rule or regulation of any Governmental Authority <br />(" Signag "), including but not limited to the California Vehicle Code, and shall assist in <br />determining the placement of such Signage, and the City hereby acknowledges and agrees that <br />the City shall be solely responsible for installing such Signage. <br />8. STANDARDS OF PERFORMANCE <br />Contractor shall meet the following Standards of Performance in the installation and operation of <br />the Redflex System. <br />a. City will establish minimum red light signal timing for each Designated <br />Intersection Approach. Contractor warrants that its camera systems will detect and capture all <br />red light violations that occur at such approach. Contractor further warrants that not less than <br />50% of the violations detected and captured by the camera systems (for vehicles for which DMV <br />information is obtainable) at each approach, based on mutually agreeable intersections and <br />approved intersection configurations as dependent on intersection geometries and characteristics; <br />will be of sufficient content and quality so as a Citation may be issued by City. Any anticipated <br />constraints which might produce less than a 50% capture rate shall be set forth in the Final <br />Acceptance form and both parties shall acknowledge any such constraint; and <br />b. Should a camera system fail to produce at least a 50% capture rate of violations <br />detected (absent any identified constraints pursuant to the Final Acceptance form) upon receipt <br />of written notice from City, Contractor shall have sixty (60) days to bring the camera systems <br />into compliance with this Standard of Performance. If Contractor fails or is unable to correct <br />such cause, City shall have the right, but not the obligation to terminate this Agreement. <br />9. ADDITIONAL RIGHTS AND OBLIGATIONS <br />Contractor and the City shall respectively have the additional rights and obligations set forth <br />below: <br />