My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA HISTORIC PRES SOC 8 - 2002
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA HISTORIC PRES SOC 8 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:04:44 PM
Creation date
5/10/2006 11:20:10 AM
Metadata
Fields
Template:
Contracts
Company Name
Santa Ana Historic Pres Soc
Contract #
A-2000-063-50
Agency
Community Development
Insurance Exp Date
7/30/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'-' <br /> <br />-....I <br /> <br />Santa Ana Historical Preservation Society <br />Howe-Waffle House <br /> <br />Scope of Work <br /> <br />Painting: <br /> <br />Carriage House and Gazebo <br />A. Prepare wood structures for painting, including repair and sanding of all holes and <br />cracks. <br />B. Apply first grade flat enamel exterior paint to all siding and decking surfaces and <br />two coats of first grade semi-gloss enamel to all trim. Trim includes under eaves, <br />soffits, and fascia. Remove all overspray. <br /> <br />Porch and Step Repairs: <br /> <br />North Side Rear <br />A. Demolish existing northeast side rear porch. <br />B. Install new stairs to match the stairs located on the west and north sides of the <br />structure. <br />C. All materials shall be equal or better grade than existing. <br /> <br />Front Porch <br />A. Repair porch steps' treads, risers, and molding. <br />B. All material shall be equal or better grade than existing. <br /> <br />North Side Porch <br />A. Repair porch steps' treads, risers, and molding. <br />B. All material shall be equal or better grade than existing. <br /> <br />South side Rear <br />A. Repair porch and steps. <br />B. All material shall be equal or better grade than existing. <br /> <br />Air Conditioning Framing: <br /> <br />A. Frame in existing electrical and refrigerant lines for AlC located in the southern <br />bedroom. <br />B. Install W' drywall to new framing. <br />C. Prepare and paint new wall to match existing. <br /> <br />Exhibit A <br />
The URL can be used to link to this page
Your browser does not support the video tag.