Laserfiche WebLink
RESOLUTION 2006 <br />REVENUE FY 06-07 <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES <br />SECTION IV FIRE DEPARTMENT <br />5544 Paramedic Subscription Fee <br /> Per Household/Business Location Annual 38.00 <br />5543 Emergency Base Rate/Transportation <br /> (in Fire Dept-owned vehicle) <br /> Per Transported Patient Each 505.00 <br />5543 Mileage Per Transport <br /> Per Transport Mile <br /> Per Transported Patient Each 14.00 <br />5540 Care Facility Inspection Fee <br /> 25 or Fewer Occupants Per Facility 75.00 <br /> 26 or More Occupants Per Facility 145.00 <br />5622 Stand By Fire Inspectors <br /> Fire Inspector <br /> •Four (4) Hour Minimum +Per Hour 55.00 <br /> Supervisor <br /> •Four (4) How Minimum •Per Hour 75.00 <br /> NOTE: Standby Fire Inspectors are required jar public frreworks <br /> displays, same unusual types oJpublic assembly events and by <br /> same motion picture studios filming on location. An unusual event <br /> that would require more than two (2J inspectors would also <br /> require a Supervisor Afier business hours and weekend <br /> inspections also require a Supervisor. <br />5551 Site Environmental Assessment <br /> File Review Per Address 70.00 <br />5545 Haz-Mat Cos[ Recovery <br /> Flat Fee (Plus additional costs) <br /> Noncommercial Vehicle Accident Per Accident 145.00 <br /> Additional Costs <br /> Per Hour or fraction of hour, Per Each Fire Company Per Accident 265.00 <br />5546 Risk Management and Prevention Program <br /> 1st Eight (8) Hours 760.00 <br /> Each Hour or Fraction OVER Eight (8) Hours 75.00 <br />5550 Fire Department Annual Inspection: <br /> 0-2,500 square feet 44.00 <br /> 2,501- 5,000 square fee[ 65.00 <br /> 5,001- 10,000 square feet 110.00 <br /> 10,000-over 22000 <br />ABOVE & UNDERGROUND STORAGE TANK FEES <br />5923 Annual Tank Fees Each 360.00 <br /> (includes tanks not currently in use) <br /> Officially Abandoned Tanks <br />5923 Installation of New Underground Tanks: <br /> Flammable Liquids l-3 Tanks 700.00 <br /> Each Add'I Tank 210.00 <br /> Hazardous Chemicals Each Tank 280.00 <br /> !ncludes Plan Check, Resubmittals & Field Inspections <br /> (working hours) <br />5923 Above Ground Storage Tank Plan Review Per Tank 170.00 <br />5923 Systems Modifications/upgrades Per Hour 105.00 <br />10 <br />75A-26 <br />