My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-06-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
06/05/2006
>
FULL PACKET_2006-06-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:46:01 PM
Creation date
5/31/2006 9:08:33 AM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2006 <br />REVENUE FY 06-07 <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES <br />SECTION X PLANNING & BUILDING AGENCY <br />5911 TEMPORARY CERTIFICATE OF OCCUPANCY Each Project 388.00 <br />SPECIFIC CODE FEES AND CHARGES <br />5911 BUILDING CODE <br />Any person desiring a permit required by the Building Code Each Permit 34.00 <br />shall, at the time of filing an application fee of $4.50 <br />towards the State Mandated Training Program and pay a fee <br />equal to $29.50 plus the sum of the fees for the work to be <br />done under the permit as set forth in the following schedule. <br />There is no minimum fee for the issuance of a permit for <br />single family residences and duplexes. <br />The determination of total valuation shall be made by the <br />Building Official. The value to be used shall be the total <br />value of all construction work for which the permit is issued <br />using the building valuation data based upon in the most <br />recent edition of Building Standards published by the <br />International Conference of Building Official. The value of <br />work performed as a remodel and other valuations not <br />published by the International Conference of Building <br />Officials shall be determined by the Building Official. <br />5911 PARKING LOT RESURFACING AND/OR REPAINTING <br />Existing parking lot resurfacing and/or repainting, fee shall <br />be based on the value of the work performed. <br />5911 UNDERGROUND TANK REMOVAL <br />Underground tank removal and backfill fee shall be based <br />upon valuation. <br />5911 EXCAVATION FOR SOIL CONTAMINATION <br />Excavation and backfill related to soil contamination fee shall <br />be based upon valuation. <br />48 <br />75A-64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.