My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-06-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
06/05/2006
>
FULL PACKET_2006-06-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:46:01 PM
Creation date
5/31/2006 9:08:33 AM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2006 <br />REVENUE FY 06-07 <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES <br />SECTION X PLANNING & BUILDING AGENCY <br />5915 MECHANICAL CODE <br /> Any person desiring a permit required by the Mechanical Each Permit 34.00 <br /> Code shall, at the time of filing an application, pay a fee <br /> of $4.50 towards the State Mandated Training Program <br /> and pay a fee equal to $29.50 plus the sum of the fees for the <br /> work to be done under the permit as set forth in the following <br /> schedule. There is no minimum fee for the issuance of a <br /> permit for single family residences and duplexes. The <br /> minimum total fee for issuance of a permit for all other uses <br /> shall be $55.25. 55.25 <br />Note: A mechanical Code permit fee is separate from and <br />additional to the fee for any other permit which may be <br />required by Code provisions other than the Mechanical <br />Code. <br />FEE SCHEDULE <br />5915 1) For the installation or relocation of each forced-air or <br />gravity-type furnace or burner, including ducts and <br />vents attached to such appliance, up to and including Each 24.75 <br />100.000 BTU/h <br />5915 2) For the installation or relocation of each forced-air <br />or gravity-type furnace or burner, including ducts <br />and vents attached to such appliance over 100,000 BTU/h Each 35.25 <br />591 S 3) For the installation or relocation of each boiler, compressor, <br />condensing unit or heat pump up to and including five <br />horsepower, or each absorption system to and including <br />100,000 BTU/h Each 42.65 <br />5915 4) For the installation or relocation of each boiler, <br />compressor, condensing unit or heat pump over five <br />horsepower up to and including 30 horsepower or <br />for each absorption system over 100,000 BTU/h up <br />to and including 1,000,000 BTUlh Each 42.65 <br />5915 5) For the installation, relocation of each boiler, compressor, <br />condensing unit or heat pump over 29 horsepower up to and <br />including 50 horsepower or for each absorption system over <br />1,000,000 BTU/h up to and including 1,750,000 BTU/h Each 51.75 <br />54 <br />75A-70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.