Laserfiche WebLink
<br />CRAZY HORSE SQUARE <br />1580 E. WARNER AVENUE / ER 2004-109 <br />MITIGATION MONITORING PROGRAM <br /> <br />MITIGATION MEASURE <br /> <br />To ensure compliance <br />with SCAQMD Fugitive <br />Dust Rule 403, building, <br />grading, and demolition <br />plans for the proposed <br />project shall reflect <br />the following notes: <br /> <br />All material excavated <br />or graded will be <br />sufficiently watered to <br />prevent excessive amount <br />of dust. <br /> <br />All clearing and <br />earthwork activities <br />shall cease during <br />period of high winds <br />(winds greater than 25 <br />mph averaged over one <br />hour) or during Stage 1 <br />or Stage 2 smog <br />episodes. <br /> <br />Streets surrounding the <br />project site should be <br />cleaned at the end of <br />each day of <br />construction. <br /> <br />All material transported <br />offsite shall either be <br />sufficiently watered or <br />securely covered to <br />prevent excessive <br />amounts of dust. <br /> <br />The amount of area <br />disturbed by clearing <br />and earthwork activities <br />shall be minimized at <br /> <br />TIMING <br /> <br />Prior to <br />Demolition, <br />Grading, <br />Building <br />Permits <br /> <br />7 SArB 8 <br /> <br />RESPONSIBLE VERIFICATION <br />AGENCY <br />Building/Planning <br />Agency <br />Public Works <br />