Laserfiche WebLink
<br />maintenance of all <br />structural BMP will <br />be provided <br /> <br />f. Operation and <br />Maintenance Plan to <br />describe the long- <br />term operation and <br />maintenance <br />requirements of all <br />applicable structural <br />BMP and to identify <br />the entity in charge <br />of implementation <br /> <br />Prior to issuance of a <br />grading permi t, the <br />proj ect applicant shall <br />submit a final surface <br />water runoff evaluation <br />for review and approval <br />showing existing and <br />proposed facilities and <br />methods of draining the <br />site without exceeding <br />the capacity of any <br />street or adjacent storm <br />drain facility. <br /> <br />Building plans for the <br />proposed project shall <br />reflect that all <br />restaurant uses be <br />fitted with a grease <br />interceptor to the size <br />and capacity as <br />designated by the <br />Building Safety Division <br />of the City of Santa Ana <br />to mitigate impacts on <br />the local sanitary sewer <br />system and regional <br />water quality. Such <br />grease interceptor shall <br />be regularly maintained <br />so as to remain fully <br /> <br />Prior to <br />issuance of a <br />Building <br />Permit <br /> <br />75ArS1 <br /> <br />BuildinglPlanning <br />Agency <br />