Laserfiche WebLink
SHORT REPORT <br />General Information Site It"tfior•mation ~ <br />Analyst JAR <br />Agency or Co. Kimley-Horn and Associates <br />Date Performed 4/6/06 <br />Time Period AM Peak Period Intersection <br />Area Type <br />Jurisdiction <br />Analysis Year Dyer/NB-55 Off-Ramp <br />All other areas <br />City of Santa Ana <br />Gen Plan 80 + Proj <br />Volume and Timin In ut <br /> EB WB NB SB <br /> LT TH RT LT TH RT LT TH RT LT TH RT <br />Num. of Lanes 0 3 0 0 3 0 2 0 1 0 0 0 <br />Lane group T T L R <br />Volume v h 1944 630 663 542 <br />Hea veh 0 0 0 0 <br />PHF 0.95 0.95 0.95 0.95 <br />Actuated P/A A A A A <br />Startu lost time 2.0 2.0 2.0 2.0 <br />Ext. eff. reen 2.0 2.0 2.0 2.0 <br />Arrival t o 4 4 3 3 <br />Unit Extension 3.0 3.0 3.0 3.0 <br />Ped/Bike/RTOR Volume 0 0 0 <br />Lane Width 12.0 12.0 12.0 12.0 <br />Parking/Grade/Parking N 0 N N 0 N N 0 N N N <br />Parking/hr <br />Bus stops/hr 0 0 0 0 <br />Unit Extension 3.0 3.0 3 .0 3.0 <br />Phasin Thru Onl 02 03 04 N B Onl 06 07 0 8 <br />Timin G= 41.0 G= G= G= G= 41.0 G= G= G= <br />g Y= 4 Y= Y= Y= Y= 4 Y= Y= Y= <br />Duration of Anal sis hrs = 0.25 C cle Len th C = 90.0 <br />Late Glrou Ca ace Control Dela and:L4S Determinate©n <br /> EB WB NB SB <br />Adj. flow rate 2046 663 698 571 <br />Lane group cap. 2358 2358 1597 736 <br />v/c ratio 0.87 0.28 0.44 0.78 <br />Green ratio 0.46 0.46 0.46 0.46 <br />Unif. delay d1 22.1 15.3 16.7 20.6 <br />Delay factor k 0.40 0.11 0.11 0.33 <br />Increm. delay d2 3.7 0.1 0.2 5.2 <br />PF factor 0.829 0.829 1.000 1.000 <br />Control delay 22.0 12.8 16.8 25.9 <br />Lane group LOS C 8 8 C <br />Apprch. delay 22.0 12.8 20.9 <br />Approach LOS C 8 C <br />Intersec. delay 20.1 Intersection LOS C <br />HCS2000"`'' Copyright ©2000 University of Florida, All Rights Reserved Version 4.1e <br />7{~A~~~ 57 <br />