Laserfiche WebLink
Back-of--Queue Worksheet <br />Page 1 of 1 <br /> BACK-OF-QUEUE WORKSHEET <br />General Information <br />Project Description Crazy Horse Square -Opening Year w/ Project - PM Peak Hour <br />Avers a Back of Queue <br /> <br />LT EB <br />TH RT LT WB <br />TH RT LT NB <br />TH RT SB <br />LT TH RT <br />Lane Group L R T T <br />Initial Queue/Lane 0.0 0.0 0.0 0.0 <br />Flow Rate/Lane Group 339 367 709 745 <br />Safflow/Lane 1805 1615 1900 1900 <br />Capacity/Lane Group 762 682 1769 2530 <br />Flow Ratio 0.2 0.2 0.2 0.1 <br />v/c Ratio 0.44 D.54 0.40 0, 29 <br />i Factor 1,000 1.000 1.000 1.000 <br />Arrival TVl1P ~ <br />_ <br />Platoon Ratio 1.00 <br />1.00 v <br />1.00 J <br />1.00 <br />PF Factor 1.00 1.00 1.00 1.00 <br />Qt 60 6.9 5.9 4.1 <br />k6 0.6 0.5 0.7 0.7 <br />Q2 0.5 0.6 0.4 0.3 <br />Q Average 6.5 7.5 6.3 4.3 <br />Percentile Back of Queue (95th percentile) <br />fa°~° 1.9 1.9 1.9 2.0 <br />Back of Queue 12.5 14 2 12 2 8 6 <br />~tueue storage Kato <br />Queue Spacing 25.0 25.0 25.0 25,0 <br />Queue Storage 975 975 450 300 <br />A <br />e <br />age Queue Storage <br />R <br />{ <br />o 0.2 0.2 0.4 0.4 <br />95% Queue Storage Ratio 0.3 0.4 0.7 0.7 <br />Copyright ©2005 University of Florida, All Rights Reserved HCS+Tti- Version 5.2 Generated: 6/5/2006 7:03 PM <br />file://C:\Temp\s2k26D.tanp 7 5A~ i1 7 Q 6/5/2006 <br />