Laserfiche WebLink
accordance with the terms of this Agreement, California Public Utilities Commission <br />("CPUC") General Order No. 95, and Licensor's construction and attachment standards <br />set forth in Exhibit A and incorporated herein by reference (all as may be amended, <br />supplemented or updated from time to time). Licensee's use of Licensor's Poles shall be <br />only for the lawful placement and use of Licensee's Equipment and for no other purpose. <br />3. License Exclusions. Nothing in this Agreement shall be construed to confer <br />any permit, license or grant to use any property other than Licensor's Poles as provided <br />in this Agreement and associated Requests. This Agreement is not a grant of right-of-way, <br />easement, or any other real property right by Licensor to use the property on which the <br />Poles are located if the property is owned by any party other than Licensor. Before <br />installing its Equipment, Licensee is responsible for obtaining permission from the <br />property owner(s) where the Pole(s) are located. In addition, nothing contained in this <br />Agreement shall be construed to permit the attachment of any Equipment to Licensor's <br />transmission towers or to any other structure owned by Licensor. <br />4. Temporary Attachments. Licensee's use of any Pole(s) is intended to be <br />temporary. Each request shall specify a license term that shall not exceed ninety (90) <br />days. This initial license term maybe extended for a specific period of time upon mutual <br />written agreement of SCE and the Licensee. Licensee's authorized contractor must <br />remove all of Licensee's Equipment covered by this Agreement from the applicable <br />Pole(s) on or before the end of the license term. <br />5. Installation of Equipment. Following Licensor's approval of a Request, <br />Licensee shall engage an authorized contractor from Licensor's list of approved <br />contractors set forth in Exhibit B and incorporated herein by reference to install the <br />authorized Equipment on the specified Pole(s). In no event shall Licensee or any <br />employee, agent or representative of Licensee, or any unauthorized contractor, attach or <br />attempt to attach any Equipment or perform any work whatsoever on any Pole. Licensee <br />shall require the authorized contractor it selects to install, maintain, or remove the <br />Equipment in accordance with Licensor's design, installation and maintenance standards <br />as set forth in the following documents furnished to all authorized contractors: <br />(1) Distribution Operations and Maintenance Policies & Procedures Manual (DOM) <br />• Section: TR - Transformers <br />(2) Distribution Overhead Construction Standards (DOH) <br />• Sections: AP —Apparatus; CO —Conductors and Splices; DC —Distribution <br />Construction; GR — Grounding Bonds and Insulators <br />(3) Electrical Service Requirements (ESR) <br />• Sections: ESR 1— General Information; ESR 2 — Overhead Service <br />Connections, 0-600V <br />(4) Pole Loading Manual (PLM) <br />• All (PLM 1-4) <br />r_j <br />