My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-12-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
12/18/2006
>
FULL PACKET_2006-12-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:42:41 PM
Creation date
12/13/2006 12:29:42 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEPTEMBER 25, 2006 <br />PAGE 4 OF 5 <br />17. The applicant shall provide a plan for lighting and landscape <br />maintenance. The lighting and landscape plan and design will <br />be reviewed by the Planning Division during the plan check <br />phase. <br />18. Prior to issuance of building permits, the exterior building <br />amenities, specifically for the roof deck area, as well as <br />materials and finishes, and roof deck railings, and <br />accessibility shall be submitted for review and approval by <br />the Planning Division. This submittal shall include landscape <br />and hardscape details, as well as furniture, any proposed <br />water feature, and/or any recreational amenity. <br />19. Prior to issuance of building permits, details regarding each <br />unit's access to the roof deck, as well as elevator <br />specifications, shall be submitted for review and approval by <br />the Planning Division. <br />20. Prior to issuance of building permits, details of the <br />building's security feature for visitors to contact individual <br />units for entry shall be submitted to the Planning Division <br />and Police Department for review and approval. <br />21. Prior to issuance of building permits, submit for review a <br />plan outlining the design of the fire access location, as well <br />as automatic fire sprinklers, fire alarms, and standpipe <br />systems. <br />22. Prior to issuance of building permits, submit a plan for <br />review indicating the location of utility vaults, <br />transformers, check valves, air conditioning units, and gas <br />and water meters. These appurtenances shall be screened from <br />public view and be integrated into the building's <br />architecture. <br />23. Prior to issuance of building permits, submit a plan for <br />review indicating the location of all water heaters. These <br />mechanical items are to be within the footprint of the <br />building. <br />24. Prior to issuance of building permits, submit a Historic <br />American Building Survey (HABS) related to the historic ghost <br />sign on the easterly adjacent building that is completed by a <br />qualified Architectural Historian to the Planning Division for <br />review and archival purposes. <br />75A-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.