Laserfiche WebLink
Environmental Checklist <br />CEQA Compliance <br /> Less Than <br /> Significant <br /> Potentially with Less Than <br /> Significant Mitigation Significant No <br />Issues & Supporting Information Sources Impact Incorporated Impact Impact <br />D. Create or contribute runoff water which would ^ ^ ^ <br />exceed the capacity of existing or planned <br />stormwater drainage systems or provide substantial <br />additional sources of polluted run-off? <br />E. Place housing within a 100-year floodplain, as ^ ^ ^ <br />mapped on a federal Flood Hazard Boundary or <br />Flood Insurance Rate Map or other flood hazard <br />delineation map? <br />F. Place within a 100-year floodplain structures which ^ ^ ^ <br />would impede or redirect flood flows? <br />G. Place housing within a 100-year floodplain, as ^ ^ ^ <br />mapped on a federal Flood Hazard Boundary or <br />Flood Insurance Rate Map or other flood hazard <br />delineation map? <br />IX. Land Use and Planning -Would the project: <br />A. Physically divide an established community? ^ ^ ^ <br />B. Conflict with any applicable land use plan, policy, or ^ ® ^ ^ <br />regulation of an agency with jurisdiction over the <br />project (including, but not limited to the general <br />plan, specific plan, local coastal program, or zoning <br />ordinance) adopted for the purpose of avoiding or <br />mitigating an environmental effect? <br />C. Conflict with any applicable habitat conservation ^ ^ ^ <br />plan or natural community conservation plan? <br />X. Mineral Resources -Would the project: <br />A. Result in the loss of availability of a locally- ^ ^ ^ <br />important mineral resource recovery site delineated <br />on a local general plan, specific plan, or other land <br />use plan? <br />~t~~°4~ 9 <br />