Laserfiche WebLink
CHAPTER 2 CEQA Findings <br />2.1 INTRODUCTION <br />This chapter presents the potential impacts that were identified in the EIR and the findings that axe <br />required in accordance with Section 15091 of the CEQA Guidelines. The possible findings for each <br />significant and/or potentially significant adverse impact axe as follows: <br />(a) Changes or alterations have been required in, or incorporated into the project which avoid, <br />substantially lessen, ox reduce the magnitude of the significant environmental effect as identified in <br />the EIR ("Finding 1"). <br />(b) Such changes or alterations are within the responsibility and jurisdiction of another public agency <br />and not the agency making the findings. Such changes have been adopted by such other agency ox <br />can and should be adopted by such other agency. ("Finding 2") <br />(c) Specific economic, social, ox other considerations make infeasible the mitigation measures ox <br />project alternatives in the EIR ("Finding 3"). <br />Table 2-1 (CEQA Findings fox the Metro East Mixed Use Overlay Zone (Program-Level Component)) <br />and Table 2-2 (CEQA Findings fox the First and Cabrillo Towers (Project-Level Component)) <br />sutmnarize the significant unavoidable impacts of Volumes I and II of the EIR, respectively, as currently <br />proposed for certification and adoption of the proposed project. <br />Additional facts that support the findings axe set forth in the Draft EIR, the Final EIR, the staff reports <br />to the Planning Commission and City Council, and the record of proceedings. <br />Metro East Mixed Use Overlay Zone EIR Findings of Fact/Statement of Overriding Considerations 2-1 <br />75B-61 <br />