Laserfiche WebLink
CHAPTER 3 Findings Regarding Project <br />Alternatives <br />3.1 INTRODUCTION <br />The EIR prepared fox the Metro East Mixed Use Overlay Zone considered two separate sets of <br />alternatives. The first set of alternatives addressed the program-level component of the Mixed Use <br />CWexlay Zone (as part of Volume 1 of the EIR) and included three altematves. The second set of <br />alternatives addressed the project-level component, also known as the First and Cabrillo Towers project <br />(as part of Volume 2 of the EIR), and included three alternatives to that component. Pursuant to Section <br />15126.6(a) of the CEQA Guidelines, the primary intent of an alternatives evaluation is to "describe a <br />range of reasonable altematives to the project, ox to the location of the project, which would feasibly <br />attain most of the basic objectives of the project but would avoid ox substantially lessen any of the <br />significant effects of the project, and evaluate the comparative merits of the alternatives." <br />This chapter describes the project objectives and design criteria used to develop and evaluate project <br />altematives presented in the Draft EIR. A description of the alternatives compared to the proposed <br />project and the findings regarding the feasibility of adopting the described altematives is presented for <br />use by the City in the decision-making process. <br />3.2 PROJECT OBJECTIVES <br />Implementation of the Overlay Zone is intended to fulfill the following major objectives: <br />^ Create an active, mixed-use urban village where it is possible to live, work, shop and play all within <br />a short walk of each other. <br />^ Facilitate well-designed new mixed-use development projects that combine residential and non- <br />residential uses through innovative and flexible design solutions. <br />^ Achieve the harmonious integration of new mixed-use development within the existing fabric of <br />the mid-rise and high-rise office environment. <br />^ Encourage urban form and architecture that incorporate contemporary design styles and solutions <br />as well as the use of sustainable building and site design concepts such as green buildings, energy- <br />conserving building materials, and landscaping designs that reduce water consumption. <br />^ Create highly-amenitized streetscapes that provide items such as landscaping, street fumituxe, <br />niche or linear parks, passive and active water features, public plazas and courtyards, public art <br />and public transportation shelters in a design that integrates the public realm with the private <br />development and serves to create a distinct identity for the district. <br />^ Provide for adequate buffering from the Santa Ana (I-5) and Costa Mesa (SR-55) Freeways. <br />^ Create ahighly-integrated pedestrian system that provides for connectivity between the residential <br />areas and public recreation amenities to the north and the Overlay Zone. <br />^ Provide for active street life through the inclusion of dedicated pedestrian-oriented design and <br />active uses on the ground floor at strategic locations. <br />^ Provide fora mix of housing in order to encourage a continuum of living and a variety of <br />household types. <br />Metro East Mixed Use Overlay Zone EIR Findings of Fact/Statement of Overriding Considerations 3-1 <br />75B-67 <br />