My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2007-03-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
03/19/2007
>
FULL PACKET_2007-03-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:41:00 PM
Creation date
3/14/2007 1:33:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
3/19/2007
Destruction Year
2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 3 Findings Regarding Project Alternatives <br />^ Transportation-Under this alternative, a greater level of commercial development could result in <br />greater vehicle trips associated with the proposed project site, resulting in potentially greater <br />impacts. <br />Implementation of Alternative 2 would result in lesser environmental impacts than the proposed project <br />with respect to Aesthetics, Population and Housing, Public Services, and Utilities and Service Systems <br />due to the lack of changes to existing land uses that would occur at the proposed project site. Impacts <br />with respect to Biological Resources, Cultural Resources, Geology and SoIls, Hazards and Hazardous <br />Materials, Hydrology and Water Quality, and Land Use would result in impacts similar to the proposed <br />project under this alternative. <br />Findings <br />The City hereby fmds that the No Project/Development Under Existing General Plan Alternative is <br />infeasible for the following environmental, economic, social, and other considerations: <br />^ Would not create an active, mixed-use urban village where it is possible to live, work, shop and <br />play all within a short walk of each other to the extent of the proposed project. <br />^ Would not achieve the hazmonious integration of new mixed-use development within the existing <br />fabric of the mid-rise and high-rise office environment due to the reduced development intensity <br />compared to the proposed project. <br />^ Would not create a differentiation between different areas of the Overlay Zone. <br />^ Would not provide fox a mix of housing in order to encourage a continuum of living and a vaziety <br />of household types to the extent of the proposed project. <br />^ Would not facilitate project designs that encourage adequate amounts of retail ox commercial <br />space to service residents and/or employees within the development and the larger Overlay Zone. <br />^ Would not allow for the development of varied residential types in a mixed-use configuration <br />including, but not limited to, loft-style units, live/work units, attached row houses, and high- <br />quality stacked flats to the extent of the proposed project. <br />^ Alternative 3: Reduced Residential Component Alternative <br />The Reduced Residential Component Alternative would involve construction of a smaller mixed-use <br />development on the project site. This altemative would construct the buildings in the same location as <br />under the proposed project, and maintain the ground floor use as commercial; however the height of <br />each residential tower would be reduced to a maximum of 19 stories each. This would reduce the total <br />FAR of the property from a 2.7 FAR under the proposed project, to a 2.5 FAR under this alternative, <br />which is the minunum envisioned FAR in the Active Urban district under the proposed Overlay Zone. <br />With a reduced height limit, the number of residential units would also be reduced from 374 to <br />approximately 335. <br />Implementation of Alternative 2 would result in lesser environmental impacts than the proposed project <br />with respect to Aix Quality, Noise, Population and Housing, Public Services, Transportation, and Utilities <br />and Service Systems due to the reduced level of development that would occur at the proposed project <br />site. Impacts with respect to Biological Resources, Cultural Resources, Geology and SoIls, Hazards and <br />Hazardous Materials, Hydrology and Water Quality, and Land Use would result in impacts similar to the <br />proposed project under this altemative. <br />Metro East Mixed Use Overlay Zone EIR Findings of Fact/Statement of Overriding Considerations 3-9 <br />75B-75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.