Laserfiche WebLink
Chapter 4 Statement of Overriding Considerations <br />Impact 4.2-5 Operation of the proposed project would exceed South Coast Aix Quality <br />Management District standards for VOC, NOX, CO, and PM,,, and would result <br />in a projected air quality violation. <br />Impact 4.2-6 Construction and operation of the proposed project could result in a cumulatively <br />considerable net increase of criteria pollutants fox which the proposed project <br />region is in nonattainment under an applicable federal ox state ambient air quality <br />standard. <br />Cumulatively, the proposed project would also have significant and unavoidable impacts with regards to <br />the above-mentioned impacts. <br />Noise <br />Impact 4.9-6 Construction activities associated with the proposed project could generate ox <br />expose persons or structures to excessive groundbome vibration. <br />Impact 4.9-7 Operation of the proposed project would generate increased local traffic volumes <br />that would cause a substantial permanent increase in ambient noise levels in the <br />project vicinity. <br />Cumulatively, the proposed project would also have significant and unavoidable impacts with <br />regards to the above-mentioned impacts. <br />Transportation <br />Impact 4.12-7 Implementation of the proposed project would cause an increase in traffic which <br />is substantial in relation to the existing traffic load and capacity of the street <br />system. <br />Impact 4.12-8 Implementation of the proposed project would exceed standards established by <br />the Orange County Transportation Authority within the study area. <br />Cumulatively, the proposed project would also have a significant and unavoidable impact with regards to <br />the above-mentioned impact. <br />^ Short-Term Impacts <br />Of the seven significant unavoidable impacts directly attributable to the proposed project and associated <br />cumulative impacts, as identified above, none would be classified as short-term. Because this document is <br />programmatic in nature and would be used to guide future development and subsequent envixontnental <br />analysis within the City, potential short-term impacts will be analyzed during specific projects CEQA <br />review. <br />^ Long-Term Impacts <br />Of the seven significant unavoidable impacts directly attributable to the proposed project and associated <br />cumulative impacts, as identified above, all of the aforementioned impacts axe considered long-term. <br />42 Metro East Mixed Use Overlay Zone EIR Findings of Fact/Statement of Overriding Considerations <br />75B-78 <br />