My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11A - Metro East Documents
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
04/02/2007
>
11A - Metro East Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:40:42 PM
Creation date
3/28/2007 11:05:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
11A
Date
4/2/2007
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT C <br /> <br />Additional Offsite Mitigation Measures <br /> <br />Improvement <br /> <br />Location <br /> <br />Pay fair share of all costs to acquire required Fourth Street at Southbound SR-55 on-ramp <br />right of way for and construct eastbound right (Tustin Avenue to SR-55) <br />turn lane <br /> <br />In order to implement & satisfy mitigation First Street and Cabrillo along the project <br />measure MM 4.12 2, construct raised "pork- frontage <br />chop" island to Public Works Agency <br />specifications <br /> <br />Note: For offsite public improvements constructed by Owner (i.e., "pork-chop" island), it shall <br />pay all workers employed in connection with the work not less than the prevailing rates of <br />wages, as provided in the statutes applicable to public works contracts, including without <br />limitation 99 1770-1780 of the California Labor Code. <br /> <br />11 A-12-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.