My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11A - Metro East Documents
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
04/02/2007
>
11A - Metro East Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:40:42 PM
Creation date
3/28/2007 11:05:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
11A
Date
4/2/2007
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />8.4 TIME LIMITS <br /> <br />MEMU Site Plan Review shall automatically become void <br />after two (2) years from the effective date of such approval <br />when the owner fails to institute an action to erect, build, <br />alter, move or maintain the use of the properly as specified <br />in the terms and conditions of the MEMU Site Plan Review. <br />Cily Council may, by resolution, extend the date on which <br />a MEMU Site Plan Review becomes void for a period or <br />periods not exceeding three (3) years in total beyond the date <br />it would otherwise become void. <br /> <br />Acceptable action shall be considered to be actual <br />construction, alteration, repairs and use of the structures and <br />land. Preparation of plans, financial negotiations, or change <br />of properly owners are not considered sufficient evidence of <br />action. <br /> <br />8.5 DEVELOPMENT CAPACITY MONITORING <br />AND ENVIRONMENTAL REVIEW <br /> <br />In order to maintain conformily with the provisions of the <br />environmental analysis completed for this project under the <br />California Environmental Qualily Act (CEQAl, development <br />capacily within the MEMU Overlay Zone shall be limited <br />to 1.27 million gross square feet of commercial (retail and <br />service) and 3.41 million gross square feet of office space. <br />This corresponds to a potential net increase of 963,000 <br />square feet of commercial, and 690,000 square feet of <br />office space, and the potential for 5,551 residences above <br />existing development. When new development within the <br />MEMU Overlay Zone reaches 80 percent of the allowable <br />increased capacily, no development shall be entitled until <br />an environmental review, including a traffic study, has been <br />completed pursuant to CEQA. These development capacily <br />"triggers" are as follows: <br /> <br />a. Commercial-770,400 square feet <br /> <br />b. Office-552,000 square feet <br /> <br />c. Residential-4,440 units <br /> <br /> <br />melro east mlxed.use o\;erlay zone <br /> <br />11 A-50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.