My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2007-04-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
04/02/2007
>
FULL PACKET_2007-04-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:40:36 PM
Creation date
3/28/2007 12:14:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
4/2/2007
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />APRIL. 2, 2007 <br />~~ <br />CONTRACT AWARD FOR <br />POOL REFINISHING AT <br />EL SALVADOR PARK POOL <br />(SPEC. NO. 07-028) <br />2 ~ ~ i/' `'tu -~ <br />C~ CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />^ As Recommended <br />^ As Amended <br />^ Ordinance on 151 Reading <br />^ Ordinance on 2" ° Reading <br />^ Implementing Resolution <br />^ Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />Award a contract to South Coast Pool Plastering, Inc., for pool refinishing <br />in the amount of $52,800. <br />DISCUSSION <br />The Parks, Recreation and Community Services Agency maintains and operates <br />five swimming pools, which provide a wide variety of aquatics programs for <br />the community. The pools, four of which are over 20 years old, require <br />resurfacing as needed. Park Services has been systematically replacing the <br />fiberglass linings with plaster surfaces at the pools for enhanced safety <br />and efficient routine maintenance. <br />The E1 Salvador Center pool, which serves over 600 residents annually with <br />recreation swim programs, is one of two pools remaining to be renovated. <br />The fiberglass lining, which was installed in 1987, has started to detach <br />from the wall and floor surface areas due to weather and use. The original <br />lining will be removed and replaced with a new plaster surface. when the <br />renovation is complete, the preventative maintenance program calls for <br />resurfacing of the pool every 10-15 years. <br />The notice inviting bids was advertised on February 26 and 28, 2007, and <br />bids were solicited. A summary of the bid invitations and bids received is <br />as follows: <br />24 Invitations For Bid mailed <br />2 Invitations For Bid mailed to Santa Ana vendors <br />2 Bids received <br />22E-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.