My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Appropriation Adjustment Recognizing Measure M2 Grant Funding for Dyer Road
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/01/2025
>
Item 12 - Appropriation Adjustment Recognizing Measure M2 Grant Funding for Dyer Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 4:34:47 PM
Creation date
3/26/2025 9:07:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
12
Date
4/1/2025
Destruction Year
p
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 4 <br />PROJECT TITLE: <br />Dyer Road Improvements (55 Freeway <br />700' E/O Pullman) Project <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widenina <br />LOCATION MAP <br />AGENCY: <br />Public Works <br />A� <br />N <br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The project will consist of pavement improvements, curb and gutter, <br />driveways, manholes adjustments, wheel chair ramps, sidewalk, add <br />through lanes eastbound and westbound, bike lanes with a bike lane <br />buffer, and landscaping <br />PROJECT COSTS <br />Engineering <br />PROJECT NEED: <br />Additional through lanes are needed in each direction to address bottleneck <br />caused by the freeway. <br />FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />2,365,200 - - - - - - <br />TOTAL 2,365,200 - - - <br />ISOURCE OF FUNDS FY 25/26 FY 26/27 FY 27/28 FY 28129 FY 29/30 FY 30/31 FY 31/32 <br />MEASURE M2 COMPETITIVE 2,365,200 - - - - - - <br />TOTAL 2,365,200 - - <br />DIVISION: <br />CIP Engineering <br />CONTACT: <br />Gilbert Castillo, Senior Engineer <br />DATE: <br />01-Apr-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.