My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Cooperative Agreement with the Cities of Brea, Placentia, Anaheim, and Orange
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/01/2025
>
Item 18 - Cooperative Agreement with the Cities of Brea, Placentia, Anaheim, and Orange
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 4:36:39 PM
Creation date
3/26/2025 9:07:27 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
4/1/2025
Destruction Year
p
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP <br />e ' ' ► � e ae1��i1JAe��C�7��1�1�7� �i e � ' �71�i�� <br />Criteria (Max Points) <br />Estimated <br />Points <br />1. <br />Transportation Significance (25 points) <br />Yas,, All agencies are participating in the Countywide Baseline Project <br />Inclusion of offset signals w/in 2,700' <br />25 <br /># of offset signals on project / total # of offset signals-: 3 / 115 = <br />100 0% <br />= 10 <br />Vehicle Miles Traveled (VMT): 367,503 <br />= 15 <br />2. <br />Economic Effectiveness (Cost to Benefit Ratio): (10 points) <br />5 <br />Calculation for Total Project Cost / VMT = $5,710,658 / 367,503 <br />= 15.54 <br />3. <br />Project Characteristics: (20 points) <br />10 <br />Average 7roiect improvement score <br />= 33.6 <br />4. <br />Project Scale: (20 points) <br /># of signals along entire length of corridor: fit <br />= 10 <br />20 <br /># of signals being synched / total # of corridor signals: 61 / 61 = <br />100.0% <br />= 10 <br />5. <br />Number of Jurisdictions: (10 points) <br />10 <br />6 Participating Jurisdiction(s) <br />6. <br />Current Project Status (10 points) <br />Yas, Retiming 75% of previous project <br />= 5 <br />5 <br />Not Timing 75% of new eligible project <br />= 0 <br />Not Implementing within 12 months <br />= 0 <br />7. <br />Funding Match: (5 points) <br />0 <br />$1,142,131.90 / $5710,657.50 <br />= 20.00% <br />Total Estimated Points: <br />75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.