Laserfiche WebLink
ELIGIBLE IMPROVEMENTS <br />SCORE BASED ON STATUS <br />Signal Timing (No Capital) <br />Online <br />Offline <br />Timing Only <br />50 <br />30 <br />Timing + Traffic Responsive license only <br />50 <br />15 <br />Timing + Peer -to -Peer (configuration only) <br />50 <br />40 <br />Timing + Traffic Adaptive (license only) <br />40 <br />1 <br />Signal Communication <br />No Time Source <br />Time Source <br />Above ground (e.g. wireless, cellular, etc.) <br />50 <br />30 <br />Fiber Optic underground <br />25 <br />15 <br />All other (e.g. copper, aerial fiber, GPS, etc.) <br />5 <br />1 <br />Field Elements <br />None/5+ Years <br />Within 5 Years <br />ATC signal controller <br />50 <br />10 <br />Signal cabinet on existing foundation <br />30 <br />10 <br />Signal cabinet on new foundation <br />15 <br />5 <br />BBS/USP (attached) <br />20 <br />10 <br />BBS/UPS on existing foundation <br />10 <br />5 <br />BBS/UPS on new foundation <br />5 <br />1 <br />CCTV <br />30 <br />10 <br />Vehicle detection (ATSPM inputs + counts) <br />50 <br />30 <br />Vehicle detection ATSPM inputs <br />40 <br />20 <br />Vehicle detection + bicycle detection <br />30 <br />15 <br />Vehicle detection <br />30 <br />15 <br />detection <br />30 <br />15 <br />—Bicycle <br />Pedestrian detection (audible) <br />50 <br />30 <br />Pedestrian detection <br />30 <br />15 <br />Active transportation/pedestrian safety <br />50 <br />30 <br />Transit Signal Priority <br />50 <br />25 <br />EVP (hybrid or GPS) <br />40 <br />10 <br />EVP (infrared) <br />30 <br />10 <br />Speed feedback signs (existing post) <br />40 <br />10 <br />Speed feedback signs new post <br />20 <br />10 <br />Signal Performance Monitoring <br />40 <br />10 <br />Minor Signal Operational Improvements <br />None/5+ Years <br />Within 5 Years <br />Channelization <br />40 <br />20 <br />Signal phasing improvement <br />50 <br />25 <br />TMC/TOC <br />None/10+ Years <br />Within 10 Years <br />Central System (server, licenses, workstations) <br />40 <br />20 <br />Display (video wall, VMS, etc.) <br />30 <br />10 <br />UPS for TMC <br />20 <br />5 <br />Caltrans Participation <br />With Coop <br />Without Coop <br />Caltrans Cooperative Agreement <br />50 <br />25 <br />