My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Agreement for Pavement Managment Program Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/01/2025
>
Item 19 - Agreement for Pavement Managment Program Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 4:37:21 PM
Creation date
3/26/2025 2:22:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19
Date
4/1/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o' CTA &GO Countywide Pavement Management Plan Guidelines <br />Local Tax Dollars at Work <br />Condition Survey Procedures <br />The governing document in performing condition surveys for the Enter agency namFis ASTM D6433 <br />"Standard Practice for Roads and Parking Lots Pavement Condition Index (PCI) Surveys." Both asphalt <br />concrete (AC) and Portland cement concrete (PCC) pavements are included in this protocol. The <br />following distresses are collected for each pavement type. <br />Asphalt Concrete AC Pavements <br />1. Alligator (fatigue) cracking <br />2. Bleeding <br />3. Block cracking <br />4. Bumps and sags <br />5. Corrugation <br />6. Depression <br />7. Edge cracking <br />8. Joint reflection cracking <br />9. Lane/Shoulder drop off <br />10. Longitudinal & Transverse cracking <br />11. Patching and utility cut patching <br />12. Polished aggregate <br />13. Potholes <br />14. Railroad crossing <br />15. Rutting <br />16. Shoving <br />17. Slippage cracking <br />18. Swell <br />19. Weathering <br />20. Raveling <br />Portland Cement Concrete (Jointed) <br />1. Blowup/buckling <br />2. Corner breaks <br />3. Divided slab <br />4. Durability ("D") cracking <br />5. Faulting <br />6. Joint seal damage <br />7. Lane/shoulder drop off <br />8. Linear cracking <br />9. Patching (large) and utility cuts <br />10. Patching (small) <br />11. Polished aggregate <br />12. Popouts <br />13. Pumping <br />14. Punchout <br />15. Railroad crossing <br />16. Scaling, map cracking and crazing <br />17. Shrinkage cracks <br />18. Spalling (corner) <br />19. Spalling (joint) <br />Any exceptions to the above procedures are discussed before any surveys are performed. These are <br />documented in the paragraphs below. <br />[Note to agency: these are usually related to distresses or situations that are not covered in the manuals. <br />Examples include roller check marks or edge cracking on streets with no curbs and gutters. Others <br />include the raveling of surface seals or the use of open -graded asphalt concrete mixes where the surface <br />appears to have large voids present. Any modifications must be documented and included in this <br />document. Photos are extremely helpful.] <br />All surveys are performed as Indicate type of surveys - walking, windshield, semi -automated etc. <br />surveys, and a minimum 10% sampling rate is utilized. Field crews are typically composed of Click here <br />to enter field crew informatic (Typically a one -person crew on residential streets and some collectors, <br />and up to two -person crews for major arterials, depending on traffic volumes and speeds. Edit as <br />appropriate). The safety of field personnel is paramount in all instances. <br />Effective March 2024 A-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.