My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Agreement for Pavement Managment Program Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
04/01/2025
>
Item 19 - Agreement for Pavement Managment Program Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 4:37:21 PM
Creation date
3/26/2025 2:22:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19
Date
4/1/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCTAm &GO <br />Local Tax Dollars at Work <br />Countywide Pavement Management Plan Guidelines <br />Inspector's Qualifications and Experience <br />The Enter agency here inspectors have attended formal training on pavement condition distress <br />surveys. This training was conducted prior to performing any work using the ASTM D6433 protocols, <br />consistent with OCTA's requirements. <br />Date of ASTM D6433 <br />Inspector Name <br />Training Conducted By: <br />Training <br />Click here to enter <br />Click here to enter <br />Click here to enter <br />Click here to enter <br />Click here to enter <br />Click here to enter <br />Resumes of the technicians utilized on this project are included as an attachment. <br />Safety Procedures <br />The Enter agency here administers a health and safety program in compliance with the Cal <br />Occupational Safety and Health Administration (OSHA) Title Vill, Section 3203. The program is <br />documented in Enter document name herE . <br />Generally, the safety procedures include (Edit as applicable to agency): <br />• Inspectors to wear a Class 2 or 3 safety vest at all times; <br />• Flashing beacon on all vehicles utilized for surveys; and <br />• Stopped vehicles to be parked at locations away from moving traffic (e.g. nearby parking, <br />shoulders, etc.). <br />• Enter safety protocol here. <br />On streets where there is a high volume of traffic or high speeds, additional measures may be <br />necessary, such as: <br />• Surveys to occur during off-peak periods or on weekends; <br />• Additional inspector to watch out for traffic; and <br />• Traffic flaggers in extreme cases. <br />Attachment — Appendix C: Resumes of Field Inspectors <br />---End of QA/QC Plan <br />Effective March 2024 A-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.