Laserfiche WebLink
In addition, the proposed project is estimated to generate approximately 50 AM peak hour and 50 <br />PM peak hour trips. With two public driveway locations serving the site (and a third truck only access) <br />and the existence of a two-way left turn lane already in place on Fourth Street, no significant back-up of <br />left turning traffic is anticipated at the project entrances. Sufficient gaps of adequate duration are <br />available on Fourth Street during the peak hours to allow project traffic to enter and exit the site via a left <br />tum. Observation of the effect of frequent train crossings of Fourth Street indicates these temporary <br />blockages of through traffic albeit frequent are of short duration (less than one and a half minutes) and do <br />not negatively impact access to the site. In fact in one respect, access to and from the east these train <br />blockages actually improve accessibility of the site. <br />Santa Ana HD Supply Repair and Remodel Site 8 Aus[in-Foust Associates, Inc. <br />Traffic and Parking Analysis 1073001ryt.doc <br />31 A-66 <br />