My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2007-04-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
04/16/2007
>
FULL PACKET_2007-04-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:40:18 PM
Creation date
4/11/2007 1:53:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
4/16/2007
Destruction Year
2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In addition, the proposed project is estimated to generate approximately 50 AM peak hour and 50 <br />PM peak hour trips. With two public driveway locations serving the site (and a third truck only access) <br />and the existence of a two-way left turn lane already in place on Fourth Street, no significant back-up of <br />left turning traffic is anticipated at the project entrances. Sufficient gaps of adequate duration are <br />available on Fourth Street during the peak hours to allow project traffic to enter and exit the site via a left <br />tum. Observation of the effect of frequent train crossings of Fourth Street indicates these temporary <br />blockages of through traffic albeit frequent are of short duration (less than one and a half minutes) and do <br />not negatively impact access to the site. In fact in one respect, access to and from the east these train <br />blockages actually improve accessibility of the site. <br />Santa Ana HD Supply Repair and Remodel Site 8 Aus[in-Foust Associates, Inc. <br />Traffic and Parking Analysis 1073001ryt.doc <br />31 A-66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.