My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2007-04-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
04/16/2007
>
FULL PACKET_2007-04-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:40:18 PM
Creation date
4/11/2007 1:53:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
4/16/2007
Destruction Year
2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~ ~ <br />AND AIR CONDITIONING, INC. <br />Feb. 26, 2007 <br />City of Santa Ana Planning Commission <br />20 Civic Center Plaza <br />Santa Ana, CA 92702 <br />Re: HD Supply variance request 07-O1 <br />3rd letter this date, additional parking related <br />issue -lack of parking allowance for day laborer accommodations <br />To the members of the Planning Commission: <br />According to information provided by HD Supply, within their request for variance, from page 6 of the <br />parking study: <br />"Another unique factor observed at these Contractors' Warehouse parking lots was the activity of day <br />laborers. Both stores attracted day laborers who generally stand around the entrance of the parking <br />lot waiting for possible work from a contractor visiting the store. Some of the day laborers drive to <br />the stare and park their cars there, but most carpool or are dropped off at the store by someone else. <br />At the Montebello store, those day laborers who parked there used one of the areas most utilised by <br />Contractors' Warehouse customers, as opposed to using the parking that is farthest from the <br />entrance. In contrast, day laborers parked in the parking area farthest from the entrance along the <br />street at the Pomona store. Additional day laborer activity includes an office trailer that is setup an <br />the edge of the Pomona parking lot that offers assistance to the day laborers. Also, a catering service <br />arrived and parked their truck and food-trailer in the parking lot of the Montebello store, serving <br />food primarily to the day laborers. This catering service apparently operates six days a week from <br />12:30 PM to 4:30 PM." <br />HDS has not allowed for facilities to accommodate day laborers or catering trucks in their parking <br />analysis. Thus reducing further their inadequate, according to Code, allowances for off-street parking. <br />I therefore request that the Planning commission deny the HD Supply request for variance no. 07-01. <br />Respectfully submitted, <br />Ci~Z~-G ~~ <br />Mike Tardif <br />Page 8 of 43 <br />412 N. Santa Fe St., Santa Ana, CA 92701-4907 4 Ph~~ (j14~~-7135 • Fax: (714) 547-4221 f State Lic. #247615 <br />
The URL can be used to link to this page
Your browser does not support the video tag.