My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2007-05-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2007
>
05/07/2007
>
FULL PACKET_2007-05-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:39:57 PM
Creation date
5/2/2007 12:58:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/7/2007
Destruction Year
2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />MAY 7, 2007 <br />TITLE: <br />CONTRACT AWARD FOR FAIRVIEW/ <br />MACARTHUR INTERSECTION <br />WIDENING AND EDINGER/MOHAWK <br />TRAFFIC SIGNAL MODIFICATION <br />(PROJECT NOS. OS-1707 AND 07- <br />1026) <br />r <br />~,,,.~-1 <br />CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />^ As Recommended <br />^ As Amended <br />^ Ordinance on 1~' Reading <br />^ Ordinance on 2n° Reading <br />^ Implementing Resolution <br />^ Set Public Hearing For <br />CONTINUED TO <br />FILE NUMBER <br />1. Award a contract to Alliance Streetworks, Inc., the lowest <br />responsible bidder, in accordance with unit bid prices in the <br />estimated amount of $668,966 for construction of Fairview/MacArthur <br />intersection widening and Edinger/Mohawk traffic signal modification. <br />2. Approve a Funding Analysis with a total estimated construction cost <br />of $836,400. <br />The proposed widening at Fairview Drive and Edinger Avenue provides for <br />the addition of right-turn lanes for the southbound and eastbound <br />approaches (Exhibit I). These improvements are needed to improve traffic <br />flow through the intersection which currently is not operating at an <br />acceptable level of service. This project provides for construction of <br />new street pavement, sidewalks, curbs, gutters, and curbs ramps. The <br />project also includes a traffic signal modification at the intersection <br />of Edinger and Mohawk to provide protective left-turn movements and <br />right-turn movements. Improvements include replacing traffic signal <br />poles, foundations, conduits and signal equipment. Once completed, these <br />improvements will enhance safety and traffic flow for the Hector Godinez <br />High School students. <br />The Notice Inviting Bids was advertised on March 7 and 9, 2007, and bids <br />were opened on March 29, 2007. A summary of the bid invitations mailed, <br />the bids received, and the bid results follows. <br />23D-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.