My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HAM'S ELECTRICAL INC.-2007
Clerk
>
Contracts / Agreements
>
H
>
HAM'S ELECTRICAL INC.-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2013 11:30:59 AM
Creation date
9/6/2007 10:58:43 AM
Metadata
Fields
Template:
Contracts
Company Name
HAM'S ELECTRICAL INC.
Contract #
A-2007-126
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
5/21/2007
Expiration Date
8/15/2010
Insurance Exp Date
1/1/2009
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.", <br /> <br />APPENDIX A <br />(Continued) <br /> <br />Proposal Response Form <br /> <br />Miscellaneous electrical system services in XI Yes DNo <br />support of City Data Centers and Telephone I <br />Center on an as requested basis including but <br />not limited to: <br />~ Construction and installation of flex whip <br /> power cables <br />~ Provide and install circuit breakers to <br /> Power Distribution Unit <br />~ Relocation of electrical equipment <br />~ Provide and install electrical equipment <br />~ Provide electrical design services <br />[ref: section 1.4] \. <br /> <br />6. Pricing <br /> <br />For the purposes of Vendor selection, please provide your firm's pricing for the following typical <br />items: <br /> <br />6.1 L 15--30 Outlets <br />Price to provide labor and materials as required to install two (2) L 1 ,,;ground outlets <br />with 30 foot blue sealtite flex w~i8s at the City of Santa Ana Data Center (location: City Hall <br />basement). Install two (2) QO~ircuit breakers at PDU-Panel"B", to feed flex whips. <br />Identify panel schedule, circuit'rmwrbers on new outlets and test outlets to verify correct voltage <br />and phase rotation. Installation is to be done during normal work hours. \il~~Il'lcl~ta*~$as'tit#, <br />separate line item. Exclusions: Plans, Permits, and associated fees. ,.,. .. '..' . <br />~ ';., . . <br /> <br />$1 ; 378. 00..., (see ..comjmter:breakdown included) <br />We. do not "have a 'Resal~' nUmber, therefore, our prices are always "1-Lot" <br />wmch inchides all Freiqht arid taxes. <br />Price is based on' "Regular" working hours. <br /> <br />6.2 Power Distribution Unit (PDU) <br />Pricing to provide and install a Powerware Powerpak Power Distribution Unit to service <br />the City's Data Center. Unit to replace an existing PDU and to connect in the same manner into <br />the existing City Data Center electrical infrastructure. The unit to be provided is to be a Eaton <br />Powerware PDU with the following specifications: .' <br />)- kVA rating: 150 kVA <br />)- input: 480 VAC, three phase, 3 wire plus ground, 60 Hertz' <br />)- output: 120V/208 VAC, three phase, 4 wire plus ground, 60 Hertz <br />)- K12 isolation transformer <br />)- TVSS output system <br />)- Transient suppression plate <br />)- Floor Stands (18") ...'..., , <br />)- Junction box with terminal-B/bck"assembly <br /> <br />Page 11 of 25 <br /> <br />EXHIBIT 84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.