Laserfiche WebLink
<br />. ... HAM'.S.. ELECTRIC INC <br />1'848 \1',(11th "ST. <br />UPLAND, CA 91786 <br /> <br />Cost Extension by Phase <br />01/30/2007 <br />02:58 PM <br /> <br />Estimate #2062 City of Santa Ana / L 15-30 Outlets <br /> <br />Page 1 <br /> <br />Description <br /> <br />Quantity TU <br /> <br />Material Adj% Total Material Labor Units Labor Hours Total Labor <br /> <br />11 UPS <br />11.11 UPS SYSTEMS <br />#10 THHN Stranded Copper Wire 350.00 IF 162.23 0.00 <br />112" Liquid Tight Flexible Conduit 60.00 LF 126.70 0.00 <br />112" Liquid Tight Straight Connector 4.00 EA 249.50 0.00 <br />30a 'IG' Single Recept., , Spec Grade 2.00 EA 47.89 0.00 <br />Bell Box 1-G, 4 -1/2" Hubs 2.00 EA 515.34 0.00 <br />Bell 1-G Lift Single Outlet Plate 2.00 EA 298.00 0.00 <br />30a, Circuit Breaker, 3-PoIe , Bolt-On 2.00 EA 121.27 0.00 <br />(E) PDU 1.00 EA 0.00 0.00 <br /> <br />11 UPS <br /> <br />56.78 0.00500 1.75 96.25 <br />76.02 0.02000 1.20 66.00 <br />9.98 0.10000 0.40 22.00 <br />95.78 0.20000 0.40 22.00 <br />10.31 0.30000 0.60 33.00 <br />5.96 0.10000 0.20 11.00 <br />242.55 0.40000 0.80 44.00 <br />0.00 0.50000 0.50 27.50 <br />$. 497.38 5.85 $321.75 <br />$ 497.38 5.85 $ 321.75 <br /> <br />Material <br />Labor <br /> <br />$ 497.38 <br />$ 321.75 <br /> <br />$ 819.13 <br /> <br />Total Takeoff <br /> <br />ProEst Estimating <br /> <br />EXHIBIT B7 <br />