Laserfiche WebLink
<br />. J-IAM'8..ELECTRIC INC Cost Extension by Phase <br />1848 W 1'1th ST. 02101/2007 <br />UPLAND, CA 91786 02:14 PM <br />Estimate #2429 City of Santa Ana J PDU Project Page 1 <br />Description Quantity TU Material Adj% Total Material Labor Units Labor Hours Total Labor <br />2 SWITCHGEAR <br />2.2.1 SWITCHGEAR <br />Ene. 3-Pole CIB (225A) 480V Nema I 1.00 EA 0.00 0.00 0.00 4.00000 4.00 220.00 <br />"Lugs", for (E) Bypass Panel 1.00 EA 55.00 0.00 55.00 2.00000 2.00 110.00 <br /> $ 55.00 6.00 $ 330.00 <br /> 2 SWITCHGEAR $ 55.00 6.00 $ 330.00 <br />5 FEEDERS <br />6.5.1 FEEDERS <br />#2 THHN Stranded Copper Wire 22.00 IF 1,405.84 0.00 25.31 0.01445 0.31 17.05 <br />#410 THHN Stranded Copper Wire 100.00 IF 3,166.18 0.00 316.62 0.02300 2.30 126.50 <br />Conduit Small Unistrut Conduit Rack 1.00 EA 10.00 0.00 10.00 0.50000 0.50 27.50 <br />2-1/Z' EMT Conduit 10.00 IF 611.64 0.00 61.16 0.15000 1.50 82.50 <br />2-1/2" EMT Die-Cast Compression Connector 2.00 EA 1,530.67 0.00 30.61 0.40000 0.80 44.00 <br />2-1/2" EMT 90 Degree Elbow 1.00 EA 1,943.50 0.00 19.44 0.50000 0.50 27.50 <br />2-1/Z' EMT Strut Clamp 1.00 EA 180.50 0.00 1.81 0.04000 0.04 2.20 <br />2-1/2" Plastic Bushing 4.00 EA 196.96 0.00 9.06 0.06000 0.24 13.20 <br />2-1/2" Liquid Tight Flexible Conduit 10.00 IF 909.30 0.00 90.93 0.24000 2.40 132.00 <br />21/2" Liquid Tight Straight Connectors 2.00 EA 8,742.80 0.00 174.86 0.45000 0.90 49.50 <br /> $ 739.80 9.49 $ 521 .95 <br /> 5 FEEDERS $ 739.80 9.49 $ 521.95 <br />11 UPS <br />11.11 UPS SYSTEMS <br />PDU ( Structural Floor Stand) 1.00 EA 0.00 0.00 0.00 4.00000 4.00 220.00 <br />(E) Bypass Panel 1.00 EA 0.00 0.00 0.00 1.00000 1.00 55.00 <br />PDU (Receive and Offload) 1.00 EA 0.00 0.00 0.00 2.00000 2.00 110.00 <br />PDU (Move to Install Location) 1.00 EA 0.00 0.00 0.00 2.00000 2.00 110.00 <br />PDU & Floorstand Anchorage 1.00 EA 50.00 0.00 50.00 4.00000 4.00 220.00 <br />PDU Terminations 1.00 EA 0.00 0.00 0.00 2.00000 2.00 110.00 <br />150KVA PDU 'Powerpak' 1.00 EA 0.00 0.00 0.00 6.00000 6.00 330.00 <br />PDU System (Cut & Support Existing Floor 1.00 EA 50.00 0.00 50.00 2.00000 2.00 110.00 <br />Tiles) <br /> $ 100.00 23.00 $ 1,265.00 <br /> 11 UPS $ 100.00 23.00 $1,265.00 <br /> <br />ProEst Estimating <br /> <br />EXHIBIT 89 <br />