<br />ALTERNET NETWORKS PROPRIETARY <br /> <br />Definition of tested software and hardware configurations <br />Performance results in compliance with minimum requirements <br />Description of all demonstration or test failures, including cost/schedule impacts and <br />possible fixes/solutions <br />Recommendations <br /> <br />10. SAPD FURNISHED ITEMS <br /> <br />10.1 Customer Furnished Information <br /> <br />Item <br />SAPD and SAPD designated sites architectural, <br />mechanical and electrical drawings <br />SAPD and SAPD designated sites Standard Rack <br />Specification <br /> <br />Delivery Date <br />CDR <br /> <br />CDR <br /> <br />11. CONSULTANT'S PROPOSAL <br /> <br />The proposed agreement outlines a concept of creating a Next Generation Surveillance System <br />for SAPD. Both parties, Consultant and SAPD, will work diligently in good faith to share and <br />design functional specifications that can be implemented into a document for Requirements, <br />Specifications and/or RFPs. Consultant will work diligently and expeditiously at a minimum of <br />30 hours per week and a not to exceed 50 hours per week. Consultant shall not charge SAPD for <br />any work that exceeds the 50 hour mark and will constitute the additional hours as "pro-bono." <br />This contract shall have the ability to be renewed at the end of 500 hours of work for additional <br />contract hours towards contract completion. The hourly rate to be charged by Consultant shall be <br />eighty-five dollars per hour in US currency ($85/hr US). Payment shall be paid per milestone no <br />later than 30 days after completion of each completed milestone and paid to via check to: <br /> <br />Altemet Networks <br />1201 E. Fairhaven Ave. Ste. 20H <br />Santa Ana, CA 92705 <br /> <br />The Project Milestones consist of: <br /> <br />1) <br />2) <br />3) <br /> <br />Identify Products <br />Product Test Bench <br />Engineering <br />-System Engineering <br />Next Generation Surveillance System Specification <br />Block Diagrams <br />Consultant Specification <br /> <br />Completion Date: 3 weeks after Award <br />Completion Date: 5 weeks after Award <br />Completion Date: 12 weeks after Award <br /> <br />Power/Heat Loads per SIte and/or Rack <br />Unit Reliability Predictions <br />Rack Layouts and Elevations <br />Power Connection Table <br /> <br />25 <br />