My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - HOWE WAFFLE HOUSE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
02/04/2008
>
25H - HOWE WAFFLE HOUSE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:33:54 PM
Creation date
1/30/2008 10:54:03 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25H
Date
2/4/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM #: 5 <br />TERMITE INSPECTION (FUMIGATION /TREATMENT} <br />Priorit Code: B <br />Location: Main House, Carria a Barn, Gazebo <br />Existin Condition: Termite Infested Woodwork. <br />General Requirements: <br />^ Contractor will comply with the General Requirements located on Pages 2 and 3 of this Work <br />Write-Up. <br />Contractor Will Provide All Labor And Material To: <br />^ State licensed termite company shall make inspection of the project property and provide the City <br />Rehabilitation Division with a full report noting the location of termite activity and any <br />recommendations to replace structural members and/or plumbing fixtures or piping. <br />^ Termite Company will provide cost (material and labor) to do all fumigation. <br />Item Includes: <br />^ Reference termite report: <br />Termite Company: <br />Report No.: <br />Dated: <br />Special Conditions: <br />^ All termite repairs -shall be completed by a skilled carpenter. (Wood repair) <br />^ Termite Company after fumigation is completed shall provide the City and the Owner with a <br />"Standard Notice of Work Completed and Not Completed" form. <br />matenai r ~ ui ment ~ re e scneaule: <br />Item Descri tion /Manufacturer /Model Cost Allowance <br /> <br /> <br />Total Cost (This Item : Note: (Davis-Bacon /State Prevailing Wages a pl to this project) <br />Includes ermits, fees, material, labor, supervision, overhead and rofit. $ <br />~~ WORK WRITE-UP /PROJECT #: SP-HWH/R07 <br />Page 10 of 12 <br />Owner's <br />Initials Contractor's <br />Initials <br />25H-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.