My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - HOWE WAFFLE HOUSE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2008
>
02/04/2008
>
25H - HOWE WAFFLE HOUSE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:33:54 PM
Creation date
1/30/2008 10:54:03 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25H
Date
2/4/2008
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM #: 2 <br />EXTERIOR PAINTING -MAIN HOUSE, CARRIAGE BARN AND GAZEBO <br />Priorit Code: B <br />Location: All Exterior Wood & Metal Surfaces-Main House, Barn, Gazebo <br />Existin Condition: Older Paint -Cracked & Peelin <br />General Requirements: <br />^ Contractor will comply with the General Requirements located on Pages 2 and 3 of this Work <br />Write-Up. <br />Contractor Will Provide All Labor And Material To: <br />^ Professionally paint the exterior of the two-story house, detached carriage barn and gazebo. <br />All wood surfaces shall receive a complete and even coverage of exterior wood paint. <br />^ All wood trim, exterior doors, porch railings and steps shall receive a complete and even <br />coverage of semigloss exterior grade acrylic paint. Wood steps shall be painted with an <br />exterior paint/stain accepted for foot traffic. <br />^ All metal including wrought iron shall be properly prepared and painted with approved exterior <br />finish paint. <br />^ Paint all existing rain gutters and down spouts; Properly prepare and paint to match and <br />conform to the color detail or color scheme. Note; Rain gutters to be properly cleaned from <br />debris prior to commencing with painting. <br />^ Contractor is responsible for inspecting the existing paint and for knowledge of all existing <br />conditions that may affect the work. <br />Item Includes: <br />^ Preparation of all surfaces to be painted (wood and metal). <br />^ Removal of all loose, peeling paint, dirt, cobwebs and nests. <br />^ Removal of all superfluous hooks, nails, etc. <br />^ Repair of all holes and cracks so that they are virtually invisible. <br />o Application of a primer to all raw or new material. <br />^ The use of a (4) four, paint color scheme. <br />^ Protection to all surrounding amenities (Covering): Existing landscape /vegetation, irrigation <br />system, fencing, masonry, and existing roofing. <br />(Note: No paint drip orover-spray) <br />Special Conditions: <br />^ Body and Trim paint detail, shall follow existing paint scheme unless otherwise directed by the <br />property owners in writing with other specific request. <br />^ Contractor shall provide the owner with color samples. <br />^ Contractor will obtain the owner's written approval of the manufacturer and color of the paints <br />prior to commencing the work. <br />^ Attention to paint detail is essential throughout the scope of work. <br />^ Contractor shall coordinate with owner/lessee to address the parking of cars on the property. <br />o Contractor will be responsible for any damages from negligence to property or vehicles from <br />work related issues. <br />^ Contractor shall be responsible for the safety of the public and provide all required barricading <br />and signage necessary for the safe operations of the work. <br />WORK WRITE-UP /PROJECT #: SP-HWH/R07 <br />Page 6 of 72 <br />Owner's Contractor's <br />Initials Initials <br />25H-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.