My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (12)
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 4:34:27 PM
Creation date
3/27/2025 8:34:56 AM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2023-194-15A
Agency
Planning & Building
Council Approval Date
11/7/2023
Expiration Date
11/7/2028
Insurance Exp Date
4/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bella Terra Residential Community and Temple Project <br />• Electronic Copy of the Draft and Final NOD <br />• Filing the NOD with the County Clerk Recorder <br />• Submitting the Final IS/MND, NOD, and NOCtoSCH <br />Subtask 3.4 Mitigation Monitoring and Reporting Program <br />Through the course of.IS/MND preparation, if mitigation measures are identified, in compliance <br />with Section 21081.6 of the California Public Resources Code, Psomas will prepare a Mitigation <br />Monitoring and Reporting Program (MMRP) as part of the Final IS/MND document. The MMRP will <br />be prepared in matrixformat and will provide the timing and responsibilityfor each mitigation <br />measure. It should be noted that, later during the public hearings, if the Planning Commission or <br />City Council modify the Project and/or recommend standard conditions of approval/mitigation <br />measures for the proposed Project, Psomas will revise the MMRP. However, substantial <br />modifications to the MMRP are not assumed in the SOW and fees for this Project. <br />Subtask 3.4 Deliverables <br />• Electronic Copy (email) of the Draft and Final MMRP <br />TASI( 4 PROJECT MANAGEMENT, MEETINGS, AND PUBLIC HEARINGS <br />Subtask 4.1 Pr-QJR"anagement <br />Psomas will be responsible for managing the CEQA process for document (Addendum or IS/MND). <br />This includes ongoing coordination with the City and Project team to ensure compliance with the <br />SOW and schedule and to ensure that information is disseminated, as necessary. <br />S.ubtask4.1 Deliverables <br />• Project Management —Duration of Project <br />Subtask 4.2 Proiect Meetings <br />This task includes attendance at up to two coordination meetings (virtual or in -person), as <br />necessary, with the City, the Applicant, and Project team (in addition to the Project Kick -Off <br />meeting). This SOW assumes that the Principal -in -Charge and Project Manager will attend all <br />meetings (three hours each, which includes preparation and travel time). <br />Additional meeting attendance will be bitted on a time and materials basis, based on hourly rates <br />and subject to prior approval. <br />Subtask 4.2 Deliverables <br />• Two Meetings with the City and Project Team <br />Subtasl<4.3 Pttblic_Hearings <br />Psomas will attend the Planning Commission and City Council hearings for a total of two public <br />hearings (one Planning Commission and one City Council). Psomas will be available to provide <br />advice and input to the City and address questions regarding CEQA; the environmental review <br />process; and the findings of the environmental document, as appropriate. The preparation of visual <br />aids for the public hearings are not included in this SOW. This task assumes public hearings will be <br />gap.apuseMS..LAn.kH.i1aTa 0Fin.L%BMaTQ ISMN0-022425.d.- A-8 Scope of Work <br />
The URL can be used to link to this page
Your browser does not support the video tag.