My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COSTA MESA, CITY OF (11)
Clerk
>
Contracts / Agreements
>
C
>
COSTA MESA, CITY OF (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 11:39:32 AM
Creation date
3/27/2025 10:26:54 AM
Metadata
Fields
Template:
Contracts
Company Name
COSTA MESA, CITY OF
Contract #
A-1989-021
Agency
Public Works
Expiration Date
1/1/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />Jan Perkins /� 1 � C f <br />Date: �rCh 16 1989 <br />Euvid Grosse, Exec. Dir. <br />Froni: _P_ub11Q_WUjia_hganw <br />AA&GRDETM4EffNT BETWEEN THE CITIES OF SANTA ANA AND COSTA MESA 1DR <br />Subject: . S11 SURF - AC. ING-AL\TD—aECOI�STRUCT-L-n � �49-41----,---.--- <br />STATEMENT OF THE ISSUE <br />The City of Costa Mesa is planning to resurface and reconstruct Sunflower <br />Avenue between Bear Street and Bristol Street to rehabilitate deteriorated <br />asphalt concrete pavement and replace a portion of broken curb and gutter. <br />The City of Costa Mesa hired Norris-Repke, Inc., to perform -the design engi- <br />neering for Sunflower Avenue. <br />Since the north half of Sunflower Avenue lies within Santa Ana, the City of <br />Costa Mesa has requested that the City of Santa Ana participate in the pro- <br />ject. The Public Works Agency has reviewed the design concept for this pro- <br />ject and recommends -that the City of Santa .Ana. participate with Costa Mesa in <br />the rehabilitation of -this segment of Sunflower Avenue. <br />As the predominant portion of this segment of Sunflower Avenue lies within <br />Costa Mesa, the City of Costa Mesa will serve as the lead agency on -the pro- <br />ject. The attached Participation Agreement sets forth the terms and condi-- <br />tions of our efforts With the City of Costa Mesa in the resurfacing of <br />Sunflower Avenue. <br />U-ie -total construction cost for the Sunflower Avenue project is estimated at <br />$390,785. The estimated cost of that portion of the project located in Santa <br />Ana is approximately $172,945. In accordance with the Participation Agree- <br />ment, projected cost estimates will be adjusted to reflect the actual quan- <br />ti-ty of work done in each City. <br />Since -the City of Costa Mesa requested participation from the City of <br />Santa Ana after -the Fiscal Year 1988-89 budget was adopted, funding was not <br />allocated. An Appropriation Adjusbnent. of $200,000 is requested to cover the <br />cost of design engineering, construction engineering, and construction. <br />Funds are available in Account No. 59-551-631 from the balance remaining in <br />the Fairview Avenue resurfacing project, which was completed in September <br />of 1988. <br />FISCAL IMPACT <br />The total estimated construction cost for the resurfacing and reconstruction <br />of Sunflower Avenue from Bear Street to Bristol Street is $390,785. The City <br />of Santa Ana's share will include design engineering, construction engineer- <br />ing, and construction with a total estimated cost of $200,000. An ApprcpTia-- <br />tion Adjustment No. 162 of $200,000 is requested. Funds are available in <br />Account No. 59-551-631 from the balance remaining in the Fairview Avenue <br />resurfacing project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.